Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM06674
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/28/2022 | Commercial Plumbing | APPROVED | |||
10/28/2022 | Fire New Construction | APPROVED | |||
10/28/2022 | Site Engineering | APPROVED | |||
10/28/2022 | Site Zoning | APPROVED | |||
11/01/2022 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
11/01/2022 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: T22CM06674 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved 1. Provide fire damper where duct penetrates roof /ceiling assembly (IMC2018,607.6) sheet M301A Complied 2. Provide fire and smoke dampers where duct penetrates shaft sheet M301B (IMC2018,607.5.5) Compiled 3. Provide CO2 sensors and ventilation or alarm in an approved manner to nitrogen room, also provide sequence of operation for the CO2 system (IBC2018,908.7) sheet M301B Complied Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E202 AREA A ELECTRICAL POWER PLAN: Could not locate Keynote #4. E204 AREA B ELECTRICAL POWER PLAN: Could not locate Keynote #10. E205 AREA C ELECTRICAL POWER PLAN: Suggestion only. Add an extra receptacle on 1 or 2 other walls in Sign Out Rooms to accommodate future furniture changes. Suggestion applies to any rooms with only 1 receptacle on a single wall. E301 AREA A LIGHTING PLAN: Light switch control schedule has last column cut off. E302 AREA B LIGHTING PLAN: Hallways need some exit signs. E402 AREA C SYSTEMS PLAN: Keynote #2 shown, but only call out Keynote #1. E801 DETAILS, SCHEDULES, & RISERS DIAGRAMS: Primary for new 225KVA transformer is undersized and may nuisance trip if it remains a 225KVA transformer. Secondary side equipment could be supported by a 150 KVA transformer per typical NEC calculations. PLUMBING REVIEW COMMENTS: Denied Second Plumbing Review: 1). OK 2). SAME-FS-1 on plan page P500 in HCTT lab needs a trap -IPC 1002.1 ** Plan Page P500 still shows a floor sink without a required trap next to the clouded revision** 3). OK - ** Updated plans state hazard discharge is self contained & doesn't discharge to sanitary see P301A & P601** 4). SAME-Vacuum Piping Routing continuation note on P301A needs to refer to plan page P301B not P201B. -IPC 106.3.1 **Updated plans now direct from 301B to 201B should be 301A** 5). OK 6). SAME- Faucets with combination eye washes on plan P801 need ASSE 1071 Mixing Valves. ( this specific rating not called out in spec manual) -IPC 411.3 ** Updated P801 just states mixing valve , not specific to ASSE 1071 that is specific for eye washes.** If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |