Permit Review Detail
Review Status: Requires Resubmit
Review Details: RESIDENTIAL NEW DWELLING v.1
Permit Number - T22CM06227
Review Name: RESIDENTIAL NEW DWELLING v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/29/2022 | NPPO | APPROVED | |||
| 12/29/2022 | Residential Building | APPROVED | |||
| 12/29/2022 | Site Engineering | APPROVED | |||
| 01/12/2023 | Site Zoning | APPROVED | |||
| 01/27/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/27/2023 | Residential Building | REQUIRES RESUBMIT | PLAN REVIEW COMMENTS Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter back check time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2018 International Residential Code and 2018 International Energy Conservation Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL COMMENTS : 1. A dwelling unit providing complete independent living facilities requires compliance with design ordinances for handicap, solar water, photo-voltaic, gray water and EV charging preparations. Design Ordinances adopted by the City of Tucson. 2. All SFR and Duplex plans submitted after July 1, 2009 require a solar photo-voltaic system, or future installation preparation City of Tucson Ordinance #10549 . a. Show a minimum 300 SF clear solar-ready zone on a roof or framing plan, T103.3. Model plans should show four typical south facing roof surfaces. b. Label a double breaker space for future Photo Voltaic on the panel schedule opposite end from the main/supply side, T103.9. Update breaker space to the last panel space. 3. All construction drawings submitted after June 1, 2010, for one- or two-family dwellings must provide gray water utilization or preparation, Ordinance #10579/11089 revised July 9, 2013. notate “Gray water provision not required when property has less than 200 SF available for gray water distribution.” 4. Show compliance with the Electric Vehicle Supply Equipment Ordinance adopted by the City of Tucson Ordinance #11844 on 6/22/2021. Include a 40 ampere 240 volt dedicated branch circuit with a NEMA 14-50R receptacle for charging an electric vehicle at a proposed parking space or show the distance from transit or a bike boulevard as not greater than a quarter-mile. SECTIONS - DETAILS: 1. Exterior walls with a fire separation distance less than 3-foot to the neighboring property line require not less than one-hour fire-resistive construction. Show compliance with R302.1 (City of Tucson Amended) by providing a section detail of materials prescribed in IBC Table 721.1(2), Items 15-1.1 to 16-1. INTERNATIONAL ENERGY CONSERVATION CODE: 1. Energy Certificate: (Mandatory) place near the indoor furnace or in utility room, N1101.14. Add notation to plans. Please contact the plans reviewer if you have any questions: Ken Van Karsen (520) 837-4912 PDSD-Residential@tucsonaz.gov City of Tucson Residential Plan Review Submit a corrected plan set at https://www.tucsonaz.gov/pdsd |
||
| 12/29/2022 | PDSD Application Completeness Express | REVIEW COMPLETED |