Permit Number: T22CM05805
Parcel: 12413008A

Address:
925 E MILL ST

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - T22CM05805
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/07/2022 Commercial Electrical APPROVED
12/21/2022 Commercial Mechanical APPROVED
12/21/2022 Commercial Plumbing APPROVED
12/07/2022 Fire New Construction APPROVED
12/21/2022 Bldg Permits - Post Review Express PENDING ASSIGNMENT
11/08/2022 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: Wyatt Berger
Planner

PROJECT: T22CM05805
925 E Mill St – I-1
TI: Millville Studios (2nd Review)

TRANSMITTAL DATE: November 8, 2022

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the I-1 zone (UDC 4.7.29). Craftwork is a permitted use in the I-1 zone, subject to use-specific standards 4.9.5.C.2, .6, .7, and .8, and 4.9.13.Q.

1. As you are proposing a reconfiguration of an area outside a building, a development package is required. The development package is a separate submittal and must be approved prior to approval of this permit. The development package shall be submitted through the Tucson Development Center online.

2. Use the total gross floor area (gfa) of all applicable land uses within the development site to calculate the motor vehicle parking requirement (UDC 7.4.3.F.4). Refer to the definition of “gross floor area” within UDC 11.4.8. Parking appears to be calculated only for the gfa of the Craftwork use and not for the gfa of the entire building.

If you have any questions about this transmittal, please contact me at Wyatt.Berger@tucsonaz.gov.
11/07/2022 Commercial Structural REVIEW COMPLETED
11/07/2022 PDSD Application Completeness Express REVIEW COMPLETED
11/07/2022 Site Engineering REVIEW COMPLETED