Permit Number: T22CM02759
Parcel: 132130720

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - T22CM02759
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/22/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
03/22/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Activity Number: T22CM02759

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Conditionally Approved
NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances.

BUILDING REVIEW COMMENTS:
Approved


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
1. Approved/Subject to field approval


ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E1.1 ENLARGED LIGHTING PLANS: Should provide a General Lighting note to call out that hexagon numbers are fixture types as per schedule shown on E1.3.
E2.3 ENLARGED POWER PLANS: Could not locate Keynote 16.492.
E4.1 PANELBOARD SCHEDULES: Review RTU 30 circuit in panel H2A. May need to be upsized 125% per NEC for continuous loads and motor loads.

PLUMBING REVIEW COMMENTS:
Denied
Second Plumbing Review:
1). OK
2). Same-add roof drain/conductor square foot GPM loads to plan page P1. -IPC 1106.2 **Need the specific square foot GPM loads for the affected areas shown on P1, The calculation table on P3 is the incorrect code cycle & incorrect rainfall rate Tucson Amendments states 3"**
3). OK
4). OK
5). OK
6). OK


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov