Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM00211
Parcel: 10704002C

Address:
1401 W GLENN ST

Review Status: Requires Resubmit

Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1

Permit Number - T22CM00211
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/10/2025 Masonry Inspection (Deferred Submittal) Express APPROVED
04/03/2025 Water Sterilization Report (Deferred Submittal) Express APPROVED
04/15/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
04/03/2025 Air Balancing/Commissioning Report (Deferred Submittal) Express REQUIRES RESUBMIT The air balance report is not contained in this submittal.
04/10/2025 Site Prep Inspection (Deferred Submittal) Express REQUIRES RESUBMIT The site preparation special inspection was not included in this submittal. Please resubmit the document.

If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov
04/10/2025 Truss Design (Deferred Submittal) Express REQUIRES RESUBMIT Pg S1.1 under deferred submittals requires:
THE DESIGN OF THE FOLLOWING ITEMS SHALL BE PROVIDED AS “DEFERRED SUBMITTAL” ITEMS IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE SECTION 106.3.4.2. PLYWOOD WEB JOISTS THE DESIGN OF THE ITEMS LISTED SHALL BE SUBMITTED BY THE CONTRACTOR TO THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO WILL REVIEW THE DOCUMENTS. THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL PROVIDE NOTATION ON THE DOCUMENTS AFTER THEY HAVE BEEN FOUND TO BE IN GENERAL CONFORMANCE WITH THE DESIGN OF THE BUILDING. UPON ACCEPTANCE BY THE DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE, THE CONTRACTOR SHALL SUBMIT THE DOCUMENTS TO THE BUILDING OFFICIAL. DO NOT INSTALL ANY DEFERRED SUBMITTAL ITEMS UNTIL THE DESIGN HAS BEEN ACCEPTED BY THE BUILDING OFFICIAL.

Please submit that document.

If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov
04/15/2025 Concrete Installation Inspection (Deferred Submittal) Express REVIEW COMPLETED
04/03/2025 PDSD Application Completeness Express REVIEW COMPLETED