Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - T21CM09873
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/01/2023 | Water Sterilization Report (Deferred Submittal) | APPROVED | |||
02/07/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
02/01/2023 | Air Balancing/Commissioning Report (Deferred Submittal) | REQUIRES RESUBMIT | Provide the results of the capture and containment testing of the Type I hoods. Reference: Section 507.6.1, IMC 2018. | ||
02/07/2023 | Welding Inspection (Deferred Submittal) | REQUIRES RESUBMIT | Please complete Special inspection Certificate missing signature and contractor info |