Permit Number: T18CM05456
Parcel: 11705069E

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - T18CM05456
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/01/2023 Commercial Structural APPROVED
08/07/2023 Site Zoning APPROVED
09/07/2023 Water - PDSD APPROVED
09/07/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
08/29/2023 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.

1. The currently adopted IECC is the 2018 not 2012. Revise power allowances for the interior and exterior lighting.

2. Per the Pima County Assessor, Parcel 117-05-069E is approximately 2.58 acres. Not 5 acres. Revise the Outdoor Lighting Lumen calculations.

3. Provide a dedicated branch circuit and programable timer equipped with 6 HR standby power for the signs. NEC art 600.5 and 2012 City of Tucson Outdoor Lighting Code section 501.6, 403.5.

4. Is the lighting in the basement existing to remain? Please clarify. The clouded Delta2 states, “Not Used”. For clarification, please indicate what is new and what is existing to remain.

5. Are the Mechanical units existing to remain? Please clarify. The clouded Delta2 states, “Not Used”. For clarification, please indicate what is new and what is existing to remain.



Ref; 2018 IBC section 107.2.1, 2017 NEC, City of Tucson Outdoor Lighting Code.
09/07/2023 Commercial Mechanical REQUIRES RESUBMIT 1. Demonstrate energy code compliance for the addition to the building envelope using calculations based on the 2018 International Energy Conservation Code. Reference: Section C502.1, International Energy Conservation Code 2018.
2. The outside air flow rates significantly exceed the exhaust airflow rates. Show how over-pressurization of the building will be avoided. Reference: Section 501.4, IMC 2018.
09/07/2023 Commercial Plumbing REQUIRES RESUBMIT Revise the water distribution design so that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018.
08/08/2023 Site Engineering REQUIRES RESUBMIT This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.)
Please start a new FUP at our permit application web page:
https://tdc-online.tucsonaz.gov/#/home
NOTE: Documentation of a cost estimate from your contractor will be required if this project involves any reconstruction, repair, rehabilitation, structurally connected addition, or other improvement of an existing structure (including TI’s and solar). Construction of separate builds/new structures does not require a cost estimate to be provided.
Instructions:
1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record
2. Locations -> Confirm the location is accurate to the project. Click “Next”
3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next”
4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next”
5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next”
6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next”
7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next”
8. Review and Submit -> Review all information to ensure accuracy. Click “Submit”
Contact Lianne Evans at lianne.evans@tucsonaz.gov or Stephen Blood at Stephen.Blood@tucsonaz.gov if you have any questions about the FUP.
08/13/2023 Fire New Construction REVIEW COMPLETED
08/04/2023 PDSD Application Completeness REVIEW COMPLETED