Permit Number: DP19-0014
Parcel: 141114050

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE REVIEW v.1

Permit Number - DP19-0014
Review Name: DEVELOPMENT PACKAGE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/13/2023 CDRC Post Review Express PENDING ASSIGNMENT
03/13/2023 CDRC Review Coordinator Express PENDING ASSIGNMENT
03/13/2023 Commercial Plumbing PENDING ASSIGNMENT
03/13/2023 Fire New Construction PENDING ASSIGNMENT
03/13/2023 NPPO PENDING ASSIGNMENT
03/13/2023 ROW Engineering Review PENDING ASSIGNMENT
03/13/2023 Site Engineering PENDING ASSIGNMENT
03/13/2023 Site Landscape PENDING ASSIGNMENT
03/13/2023 Site Zoning PENDING ASSIGNMENT
03/13/2023 OK to Submit - Zoning Fast REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Lot 42 Brown/Rita Ranch, 9013 E Old Vail Rd
Development Package (1st Review, Revision #2)
DP19-0014

TRANSMITTAL DATE: March 13, 2023

DUE DATE: March 16, 2023

COMMENTS: Please resubmit revised drawings with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. COMMENT: 2-06.4.9.H.5.a – It does not appear that the vehicle parking space calculation is correct. Based on the revision letter you are eliminating 8 vehicle parking spaces near proposed bldg. 11, 1 accessible space & 7 regular spaces. Near bldg. 4 you eliminated 1 accessible vehicle space. Based on the submitted plans you replaced the eliminated accessible space near bldg. 4 with 2 standard spaces for a net reduction of 2 accessible parking spaces and 5 regular spaces. The parking calculations shows a reduction of 1 accessible parking space and 1 regular space. Clarify how this is possible.

2. COMMENT: It does not appear that the revision number is correct on the plans as revision #1 was approved back in 2021.

If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
03/09/2023 CDRC Application Completeness Express REVIEW COMPLETED
03/13/2023 OK to Submit - Engineering Fast REVIEW COMPLETED
03/13/2023 OK to Submit - Landscape Fast REVIEW COMPLETED