Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Review Status: Approved

Review Details: CIP - DEV SITE + COMM STRUCTURE - INITIAL v.1

Plan Number - CIP-1125-00028
Review Name: CIP - DEV SITE + COMM STRUCTURE - INITIAL v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Traffic Engineering Review APPROVED
Real Estate NOT REQUIRED Per TW Project Mgr., no Real Estate elements need to be addressed.
TSMR/PDMR - Engineering NOT REQUIRED
Zoning Administration NOT REQUIRED
Zoning Compliance Review NOT REQUIRED
Zoning Modifications - DDO NOT REQUIRED
Zoning Modifications - IPP NOT REQUIRED
Zoning Modifications - MS&R NOT REQUIRED
Zoning Modifications - Variance NOT REQUIRED
Bldg Permits - Post Review Express REVIEW COMPLETED
Building Official REVIEW COMPLETED
CDRC Post Review Express REVIEW COMPLETED Please address all reviewers' comments for the next submittal. Please fill out the additional info tab with cut and fill acres of disturbance, etc.
If any of the following apply, a Fugitive Dust Activity Permit is required from the Pima County Department of Environmental Quality (PDEQ).

Earthmoving or Land Clearing over 1 acre

Trenching over 300 feet for utility installation or repair

Road construction over 50 feet

Blasting

Please contact the following to obtain your permit.

Fugitive Dust Activity Permit: Contact Pima County ADEQ at (520) 724-7400

 https://www.pima.gov/596/Fugitive-Dust

Once received you may upload your permit to the attachment section along with any external reviewer approval letters. If you have any questions regarding this information, please contact Sonya Bermudez at sonya.bermudez@tucsonaz.gov or 520-730-7979.
Commercial Building REVIEW COMPLETED
Commercial Electrical REVIEW COMPLETED Commercial Electrical Review CIP-1125-00028 (12995 W MILE WIDE RD MARANA, AZ 85653)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

1. Note and show any hazardous locations due to the oil storage tank per NEC chapter 5.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
Commercial Mechanical REVIEW COMPLETED
Commercial Plumbing REVIEW COMPLETED
Entitlements REVIEW COMPLETED
External Reviewers - Pima Association of Governments REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required
External Reviewers - Southwest Gas REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required
External Reviewers - Tucson Electric Power (TEP) REVIEW COMPLETED This is a response from TRICO.


I believe your plans accurately reflect Trico’s system facilities that are locate near, in, around your project location.

I have included the staking sheet that built the facilities for this service.
Trico records indicate this is a 600A 277/480V three-phase underground service.
The service shows it is currently active in our system but has had zero and very little usage over recent years.

Trico will need an application submitted if you plan on needing to add a new service or modify the existing one.

I have also included an image of our system map.

Please let me know if you have any questions.







William Voorhees
Manager, Distribution Design



Trico Electric Cooperative, Inc.
PO Box 930 • Marana, AZ 85653
Phone: (520) 744-2944, ext. 1327

Trico is an equal opportunity provider and employer
External Reviewers - United States Postal Service (USPS) REVIEW COMPLETED CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required
Fire New Construction REVIEW COMPLETED No Comments
New Services/JOC REVIEW COMPLETED Tucson Water – New Area Development has no comments at this time. There is no observable impact on the existing potable water distribution main.
NPPO REVIEW COMPLETED
Outdoor Lighting REVIEW COMPLETED Note if any modifications are being made to the outdoor lighting.
ROW Engineering Review REVIEW COMPLETED Work is outside COT limits
Signs REVIEW COMPLETED
Site Engineering REVIEW COMPLETED Permit: CIP-1125-00028
Location: 12995 W MILE WIDE RD
Review Date: 12/3/2025
Site Engineering Comments:
1. Provide the general note “The developer, any successors and assigns, will hold the City of Tucson, its officers, employees, and agents harmless from any and all claims for damages related to the use of this development as shown hereon, now and in the future, by reason of flooding, flowage, erosion, or damage caused by water, whether surface flood or rainfall.” Administrative Manual 2-06.4.7.B.1
2. Provide the general note “Drainage will remain in its natural state and will not be altered, disturbed, or obstructed other than as shown on this site plan.” AM 2-06.4.7.B.3
3. Provide the general note “No structure or vegetation shall be located or maintained so as to interfere with the sight visibility triangles in accordance with Section 10-01.5.0, Sight Visibility, of the Technical Standards Manual.” AM 2-06.4.7.C.2
4. It is required that a floodplain use permit be acquired from Pima County and documentation be provided.
5. Provide total acres of disturbance on the grading plan/sheet #4

If you have any questions or concerns, please contact
Marco Contreras
Marco.contreras@tucsonaz.gov
Site Landscape REVIEW COMPLETED
Site Zoning REVIEW COMPLETED Outside City of Tucson jurisdiction. Site Zoning does not apply.
Storm to Shade Review REVIEW COMPLETED No comment
TW New Development Review REVIEW COMPLETED Tucson Water – New Area Development has no comments at this time. There is no observable impact on the existing potable water distribution main.
TW Planning and Engineering Review REVIEW COMPLETED This project is internally generated. No comments at this stage.
Water - PDSD REVIEW COMPLETED