Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Review Status: Requires Resubmit

Review Details: CIP - DEV SITE + COMM STRUCTURE - FINAL v.1

Plan Number - CIP-0824-00030
Review Name: CIP - DEV SITE + COMM STRUCTURE - FINAL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
TSMR/PDMR - Engineering NOT REQUIRED
TSMR/PDMR - Environmental Services NOT REQUIRED
TSMR/PDMR - Zoning NOT REQUIRED
Zoning Administration NOT REQUIRED
Zoning Compliance Review NOT REQUIRED
CDRC Post Review Express REQUIRES RESUBMIT Please address reviewers' comments for the next submittal. Once all have approved we will allow you to apply for DP in your TDC account.
External Reviewers - Tucson Electric Power (TEP) REQUIRES RESUBMIT December 30, 2025

WO#T128854


City of Tucson

Planning and Development Services

Attn: CDRC Admin Team


Dear CDRC Admin Team


Subject: CIP-0824-00030 Houghton "F" to "G" Booster Upgrades

CIP-0824-00030


Tucson Electric Power Company (TEP) has reviewed and cannot approve the development plan submitted 11/14/2025. There are existing facilities within the development which are not depicted upon the plan. The second submittal still does not include the existing subsurface pedestal on the plans. Please refer to the attached TEP facilities map. Further: Existing pedestal is not shown.


Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. Any relocation costs will be billable to the customer.


To apply for electric service, please call the New Construction department at (520) 918-8300. Please submit a final set of plans including approved site, electric load, paving off-site improvements and irrigation plans. If available, include a PDF version of the plans.


If easements are required, they will be secured by separate instrument. Should you have any easement questions, please contact our Land Resources Department,

LandReviews@tep.com.


Should you have any technical questions, please contact the area designer,

Martin Rodriguez

(520) 991-5495

mrodriguez@tep.com

Sincerely,


Design Admins


Design Admins

Tucson Electric Power
Bldg Permits - Post Review Express REVIEW COMPLETED
Building Official REVIEW COMPLETED
CDRC Application Completeness Express REVIEW COMPLETED Sent review to TEP
Commercial Building REVIEW COMPLETED
Commercial Electrical REVIEW COMPLETED No comments.
Commercial Mechanical REVIEW COMPLETED
External Reviewers - Southwest Gas REVIEW COMPLETED FYI sent to SWG
Fire New Construction REVIEW COMPLETED No Comments
NPPO REVIEW COMPLETED
Outdoor Lighting REVIEW COMPLETED For outdoor lighting calculations, use Option 2 from Table 401.1.
PDSD Application Completeness Express REVIEW COMPLETED
Site Engineering REVIEW COMPLETED Due to the wall being greater than 7 feet from natural grade, it will be classified as a structural wall and will require the submission of a structural wall permit alongside the required development package submission. For the wall permit, it will require the provided structural drawings/calculations for review.
Site Landscape REVIEW COMPLETED
Site Zoning REVIEW COMPLETED CDRC TRANSMITTAL

FROM: Ramiro Olivarez

PROJECT: PRJ000609 Houghton F-G Booster Station Rehab
Capital Improvement Project
CIP-0824-00030

TRANSMITTAL DATE: December 10, 2025

DUE DATE: December 09, 2025

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC), Administrative Manual (AM) Section 2-06, and the Technical Standards Manual (TSM).

1. Previous Comment: Development must comply with Administrative Manual Section 2-06.0.0 (Tentative Plats and Site Plans). Ensure all formatting and content requirements, as well as general notes, are provided on the cover sheet or the second sheet (see AM 2-06.3.1 through 2-06.4.7).

Follow up Comment: Correct general note 14 land use to “Utilities Land Use Group – Distribution System: General.”

2. Previous Comment: Demonstrate compliance with use-specific standards 4.9.11.A.1, .2, .5, .8, .9, .11, and .12.


Follow up Comment: List as a general note that use-specific standards 4.9.11.A.1, .2, .5, .8, .9, .11, and .12. have been waived by City Manager’s Office (CMO) waiver.

3. Previous Comment is still Applicable: Demonstrate that lot coverage does not exceed 15% (UDC Table 6.3-1.A). See UDC 6.4.3 for specifics relating to lot coverage.

4. If any of the above comments are unobtainable, a City Manager’s Office (CMO) waiver may be used to waive one or more standards.

5. The comments provided are preliminary according to the City’s Capital Improvement Project policy. Future submittals may receive additional comments.

If you have any questions about this transmittal, please contact me at Ramiro.Olivarez@tucsonaz.gov
TSMR/PDMR - Landscape REVIEW COMPLETED
Water - PDSD REVIEW COMPLETED
Zoning Modifications - DDO REVIEW COMPLETED
Zoning Modifications - IPP REVIEW COMPLETED
Zoning Modifications - MS&R REVIEW COMPLETED
Zoning Modifications - Variance REVIEW COMPLETED