Plan Review Detail
Review Status: In Review
Review Details: CIP - DEV SITE + COMM STRUCTURE - FINAL v.1
Plan Number - CIP-0824-00030
Review Name: CIP - DEV SITE + COMM STRUCTURE - FINAL v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| TSMR/PDMR - Engineering | NOT REQUIRED | ||||
| Zoning Administration | NOT REQUIRED | ||||
| Zoning Compliance Review | NOT REQUIRED | ||||
| CDRC Post Review Express | PENDING ASSIGNMENT | ||||
| External Reviewers - Southwest Gas | PENDING ASSIGNMENT | ||||
| External Reviewers - Tucson Electric Power (TEP) | PENDING ASSIGNMENT | ||||
| TSMR/PDMR - Environmental Services | PENDING ASSIGNMENT | ||||
| TSMR/PDMR - Zoning | PENDING ASSIGNMENT | ||||
| Bldg Permits - Post Review Express | REVIEW COMPLETED | ||||
| Building Official | REVIEW COMPLETED | ||||
| CDRC Application Completeness Express | REVIEW COMPLETED | Sent review to TEP | |||
| Commercial Building | REVIEW COMPLETED | ||||
| Commercial Electrical | REVIEW COMPLETED | No comments. | |||
| Commercial Mechanical | REVIEW COMPLETED | ||||
| Fire New Construction | REVIEW COMPLETED | No Comments | |||
| NPPO | REVIEW COMPLETED | ||||
| Outdoor Lighting | REVIEW COMPLETED | For outdoor lighting calculations, use Option 2 from Table 401.1. | |||
| PDSD Application Completeness Express | REVIEW COMPLETED | ||||
| Site Engineering | REVIEW COMPLETED | Due to the wall being greater than 7 feet from natural grade, it will be classified as a structural wall and will require the submission of a structural wall permit alongside the required development package submission. For the wall permit, it will require the provided structural drawings/calculations for review. | |||
| Site Landscape | REVIEW COMPLETED | ||||
| Site Zoning | REVIEW COMPLETED | CDRC TRANSMITTAL FROM: Ramiro Olivarez PROJECT: PRJ000609 Houghton F-G Booster Station Rehab Capital Improvement Project CIP-0824-00030 TRANSMITTAL DATE: December 10, 2025 DUE DATE: December 09, 2025 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC), Administrative Manual (AM) Section 2-06, and the Technical Standards Manual (TSM). 1. Previous Comment: Development must comply with Administrative Manual Section 2-06.0.0 (Tentative Plats and Site Plans). Ensure all formatting and content requirements, as well as general notes, are provided on the cover sheet or the second sheet (see AM 2-06.3.1 through 2-06.4.7). Follow up Comment: Correct general note 14 land use to “Utilities Land Use Group – Distribution System: General.” 2. Previous Comment: Demonstrate compliance with use-specific standards 4.9.11.A.1, .2, .5, .8, .9, .11, and .12. Follow up Comment: List as a general note that use-specific standards 4.9.11.A.1, .2, .5, .8, .9, .11, and .12. have been waived by City Manager’s Office (CMO) waiver. 3. Previous Comment is still Applicable: Demonstrate that lot coverage does not exceed 15% (UDC Table 6.3-1.A). See UDC 6.4.3 for specifics relating to lot coverage. 4. If any of the above comments are unobtainable, a City Manager’s Office (CMO) waiver may be used to waive one or more standards. 5. The comments provided are preliminary according to the City’s Capital Improvement Project policy. Future submittals may receive additional comments. If you have any questions about this transmittal, please contact me at Ramiro.Olivarez@tucsonaz.gov |
|||
| TSMR/PDMR - Landscape | REVIEW COMPLETED | ||||
| Water - PDSD | REVIEW COMPLETED | ||||
| Zoning Modifications - DDO | REVIEW COMPLETED | ||||
| Zoning Modifications - IPP | REVIEW COMPLETED | ||||
| Zoning Modifications - MS&R | REVIEW COMPLETED | ||||
| Zoning Modifications - Variance | REVIEW COMPLETED |