Plan Number: CIP-0824-00026
Parcel: 117200250

Review Status: Approved

Review Details: CIP - COMMERCIAL STRUCTURE - INITIAL v.1

Plan Number - CIP-0824-00026
Review Name: CIP - COMMERCIAL STRUCTURE - INITIAL v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
TW Planning and Engineering Review APPROVED Based on plan set provided there appears to be no change in water service nor impact to water infrastructure in ROW. Please be aware of water and transportation projects currently being planned along Church Ave from Cushing St to the north. Please send inquiries to Sarah Spencer from the City of Tucson Department of Transportation or Joshua Bohan from the City of Tucson Tucson Water.
Building Official NOT REQUIRED
Signs NOT REQUIRED
Bldg Permits - Post Review REVIEW COMPLETED
Commercial Building REVIEW COMPLETED 1. Specify the wall fire rating between the new office space and the IT space.
2. Provide an Egress Plan.
3. Show the office layout/cubicles/tables and chairs, etc making sure that the path of egress is met.
4. Identify and provide the work station complying to accessibility requirement by ICC A117.1, ensure to provide the required work surface height and required clear leg room.
Commercial Electrical REVIEW COMPLETED Please address the electrical plan review comments and provide a written response.

1 Provide compliance with the 2018 IECC for the lighting. ComCheck Certificate is acceptable.

2 Please explain what exactly is meant by the statement, “All Existing Power Circuits Power Whips Io Panel Receptacles and Task Lighting Contained In Open Office Furnishings (By Others)” , in the power plan.

3 The ‘A’ plan sheets are stamped ‘NOT FOR CONSTRUCTION’. Provide valid sealed plans.

Ref; 2018 IBC section 107.2.1, 2017 NEC, 2018 IECC, City of Tucson Commercial Plan Submittal Requirements.
Commercial Mechanical REVIEW COMPLETED The occupancy has changed from F-1 to B (Business). Evaluate the ventilation required for the new occupancy. Reference: Section 403.3.1, IMC 2018.
Commercial Plumbing REVIEW COMPLETED
Fire New Construction REVIEW COMPLETED Separate permits required for modifications to fire sprinkler and fire alarm if applicable.
Historic REVIEW COMPLETED Work appears to be located entirely in the interior of the building. The exterior will not be impacted. The building is not historically designated. No Historic review required at this time. If SOW is modified to include exterior work, please reconnect with Historic staff. Questions? Jodie.Brown@tucsonaz.gov
ROW Engineering Review REVIEW COMPLETED No comments, no impact to ROW.
Site Engineering REVIEW COMPLETED Site Engineering has no comments or objections.

Mike Ortiz
michael.ortiz@tucsonaz.gov
Site Landscape REVIEW COMPLETED Not Required.
Chad Keller, RLA
chad.keller@tucsonaz.gov
Site Zoning REVIEW COMPLETED The proposed interior-only tenant improvement does not trigger additional Zoning review at this time.
Traffic Engineering Review REVIEW COMPLETED Traffic Engineering review not required for this type of project.
TW New Development Review REVIEW COMPLETED CIP-0824-00026 - CIP - Commercial Structure - Initial v1 - 270 S STONE AV

The New Development Section currently has no developer financed projects in the immediate area that may affect or be affected by this Capital Improvement Project.

No further review of this project by Tucson Water’s New Development Section is required, as no underground utility lines are being constructed or relocated.


Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
Water - PDSD REVIEW COMPLETED
Zoning Administration REVIEW COMPLETED The proposed interior-only tenant improvement does not trigger additional Zoning Administration review at this time.
Zoning Compliance Review REVIEW COMPLETED The proposed interior-only tenant improvement does not trigger additional zoning compliance review at this time.
Zoning Modifications - DDO REVIEW COMPLETED The proposed interior-only tenant improvement does not trigger a Design Development Option (DDO) at this time.
Zoning Modifications - IPP REVIEW COMPLETED The proposed interior-only tenant improvement does not trigger an Individual Parking Plan (IPP) at this time.
Zoning Modifications - MS&R REVIEW COMPLETED The proposed interior-only tenant improvement does not trigger Major Streets and Routes review at this time.
Zoning Modifications - Variance REVIEW COMPLETED The proposed interior-only tenant improvement does not trigger a Board of Adjustment variance at this time.