Plan Number: CIP-0725-00016
Parcel: 12620001C

Review Status: Approved

Review Details: CIP - DEVELOPMENT SITE - INITIAL v.1

Plan Number - CIP-0725-00016
Review Name: CIP - DEVELOPMENT SITE - INITIAL v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
ROW Engineering Review APPROVED
Traffic Engineering Review APPROVED Traffic Engineering has no comments on the 60% plan submittal.
Real Estate NOT REQUIRED Any proposed improvements located outside property lines and into public rights-of-way require a right-of-way permit and Private Improvement Agreement with the Department of Transportation & Mobility or Temporary Revocable Easement with the Real Estate Division (separate processes). If any action is required to address property rights (dedications, easements, etc), please contact the Real Estate Division 520-791-4181.
Signs NOT REQUIRED
CDRC Post Review Express REVIEW COMPLETED FUGITIVE DUST ACTIVITY PERMIT MAY BE REQUIRED

If any of the following apply, a Fugitive Dust Activity Permit is required from the Pima County Department of Environmental Quality (PDEQ).

Earthmoving or Land Clearing over 1 acre

Trenching over 300 feet for utility installation or repair

Road construction over 50 feet

Blasting

Please contact the following to obtain your permit.

Fugitive Dust Activity Permit: Contact Pima County ADEQ at (520) 724-7400

 https://www.pima.gov/596/Fugitive-Dust

Once received, you may upload your permit to the attachment section along with any external reviewer approval letters.
Once plans reach 90-100% External Reviewers will be added to the review.
Commercial Plumbing REVIEW COMPLETED
NPPO REVIEW COMPLETED
Site Engineering REVIEW COMPLETED 1. A floodplain use permit will be needed for the proposed work.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
Site Landscape REVIEW COMPLETED
Site Zoning REVIEW COMPLETED FROM: Ramiro Olivarez
PDSD Zoning Review Section
PROJECT: CIP-0725-00016
600 S ALVERNON WY TUCSON, AZ 85711
Dell Urich Golf Course (1st Review) (30% Review)
TRANSMITTAL DATE: ‎July 24, 2025

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

1. Comment: Include a north arrow, contour interval, and scale as applicable to each sheet should be placed together in the upper right corner of each sheet.

2. Comment: An index of sheets in the development package shall be provided on the first sheet.

In the Index of sheets, Sheet 24 is labeled as 'CP101,' but the actual Sheet number 24 is labeled 'CP105' in the lower right corner.

In the Index of sheets, Sheet 25 is labeled as 'CP101,' but the actual Sheet number 25 is labeled 'CP106' in the lower right corner. Additionally, the sheet index title does not match the sheet title on the actual sheet.

*Ensure that both the sheet number and sheet titles in the index are corrected to match on All sheets.

3. Comment: Identify the brief legal description.

4. Comment: Upon formal submittal provide the development package case number adjacent to the title block on each sheet.

5. Comment: If a plan or plat is prepared in conjunction with other applications or overlays or the parcel being developed is subject to conditions of an application processed previously, additional information must be added to the plan. Such applications and overlays include, but are not limited to: annexations; rezonings; special exceptions; Board of Adjustment variances; Design Development Options; Technical Standard Modification Request; overlays (Airport Environs Zone, Environmental Resource Zone, Gateway Corridor Zone, Hillside Development Zone, Historic Preservation Zone, Major Streets and Routes, Rio Nuevo District, Scenic Corridor Zone, WASH); Modification of Development Regulations through the Downtown Area Infill Incentive District or Rio Nuevo District; Downtown Heritage Incentive Zone; or, Design Review Board. Provide the following information on the plan.

The southwest portion of this parcel is located within the Airport Hazard District. In the General, Zoning and land use notes list that this project is designed to meet the standards in Article 5.6 Airport Environs Zone (AEZ).

If applicable, list additional applications and overlays, by case number.

6. Comment: Clearly identify the calculations in general note number 7.

7. Comment: If the property includes Protected Riparian Area add a note stating that the project is designed to comply with Technical Manual Section 4-02, Floodplain, WASH, and ERZ Standard, specifying all lots impacted and including a total for the regulated area and the Protected Riparian Area.

If applicable, add the floodplain information noted above. Contact Site Engineering for floodplain information.

8. Comment: General note 13 is not correct and should read – “No structure or vegetation shall be located or maintained so as to interfere with the sight visibility triangles in accordance with Section 10-01.5.0, Sight Visibility, of the Technical Standards Manual.”

9. Comment: The following information shall be provided on the plan/plat drawing to indicate the existing conditions on site and within 50 feet of the site. On sites bounded by a street with a width of 50 feet or greater, the existing conditions across the street will be provided.

Include the conditions for the sites to the south of 22nd street.

10. Comment: Provide site boundary/subdivision perimeter information, including bearing in degrees, minutes, and seconds, with basis for bearing noted, together with distances in feet, to hundredths of a foot, or other functional reference system.

11. Comment: All easements shall be drawn on the plan. The recordation information, location, width, and purpose of all easements on site will be stated. Blanket easements should be listed in the notes, together with recordation data and their proposed status. Should an easement not be in use and be proposed for vacation or have been abandoned, so indicate. However, should the easement be in conflict with any proposed building location, vacation of the easement shall occur prior to approval of plan unless written permission from easement holder(s) is provided.

If applicable, all proposed easements (utility, sewer, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. The easements may have to be recorded and the recordation information added to the development package prior to approval.

12. Comment: If applicable, all proposed easements (utility, sewer, drainage, access, etc.) are to be dimensioned and labeled as to their purposes and whether they will be public or private. The easements may have to be recorded and the recordation information added to the development package prior to approval.

13. Comment: The following information regarding existing private or public right-of-way adjacent to or within the site shall be provided: the name, right-of-way width, recordation data, type and dimensioned width of paving, curbs, curb cuts, and sidewalks.

Identify the recordation data.

14. Comment: See Site Landscape review comments as it pertains to the following:

A conceptual grading plan is required on projects with significant topographic conditions. The PDSD Engineering Administrator or designee will determine the need for such a plan.

Concurrent Review. For all projects, grading plans may be included in the development package and will be reviewed concurrently.
15. Comment: Draw, label, and dimension all applicable building setback lines, future right-of-way building setback lines and setback lines such as erosion hazard, floodplain detention/retention basins, and zoning, including sight visibility triangles, will be shown.

16. Comment: Show on-site pedestrian circulation and refuge utilizing location and the design criteria in Section 7-01.0.0, Pedestrian Access, of the Technical Standards Manual.

On the Golf Demolition sheets, clarify the amount of SF of concrete cart path to be removed.

On all site sheets, clearly dimension the width of all proposed path improvements.

17. Comment: If applicable, indicate the locations and types of proposed signs (wall, free-standing, pedestal) to assure there are no conflicts with other requirements and that minimal locational requirements can be met. Indicate if there are any existing billboards on site. Compliance to the Sign Code, Chapter 3 of the Tucson Code, is required.

18. Comment: See Site Landscape review comments as it pertains to the following: show compliance with landscaping and screening requirements by locations, material descriptions, and dimensions. Specific plant or hardscape material shall be detailed on a landscape plan. A detailed landscape plan is required. In accordance with Section 2-11.0.0, Landscape Plan Requirements.

19. Comment: Additional comments may be forthcoming on the next review based on the proposed use.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Corrected CIP development package.
If you have any questions about this transmittal, please contact Ramiro.Olivarez@tucsonaz.gov
Storm to Shade Review REVIEW COMPLETED S2S Comments have been added to plan via Bluebeam studio session
TW Planning and Engineering Review REVIEW COMPLETED Please see redlines and comments on sheets 20, 23, 27, and 28
Urban Forestry REVIEW COMPLETED Comments made on Landscape Plan - L101 L502 with some general comments that apply to entire landscape section.
Water - PDSD REVIEW COMPLETED