Plan Review Detail
Review Status: Approved
Review Details: CIP - COMMERCIAL STRUCTURE - INITIAL v.1
Plan Number - CIP-0724-00024
Review Name: CIP - COMMERCIAL STRUCTURE - INITIAL v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
TW Planning and Engineering Review | APPROVED | Appears that there are existing 0.75" diameter service connections. If you are seeking a 1" service may be better to pursue option 2. However, any connection to the Water Distribution System needs to be approved formally through Tucson Water New Services and New Area Development. The Tucson Water CIP group will defer to their comments and direction. From recent public images, existing meter not visible from street. | |||
Building Official | NOT REQUIRED | ||||
TW New Development Review | NOT REQUIRED | CIP-0724-00024 - CIP – Commercial Structure - Initial v1 - No review by Tucson Water’s New Development Section is required. The New Development Section has no developer financed projects in this area that may affect or be affected by this Capital Improvement Project. And this project is not constructing any new public water mains. You may wish to contact Mr. Stephen Garcia of Tucson Water’s New Services Section to discuss the pros and cons of connecting to one of the existing water service lines or installing a new water service line. All the existing water service lines are ¾” service lines which may be too small for this project. Mr. Garcia can be reached at 520-837-2207 or stephen.garcia@tucsonaz.gov. Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |
|||
Zoning Administration | NOT REQUIRED | ||||
Zoning Compliance Review | NOT REQUIRED | ||||
Bldg Permits - Post Review | REVIEW COMPLETED | ||||
Commercial Building | REVIEW COMPLETED | Please submit your revised documents and provide a letter with a written response letter to address each of the comments indicating how the Building Review comments were addressed. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. 1. A detailed description of the work involved in this permit’s scope. IBC 105.3 This appears to be an IEBC Level 3 alteration of an existing building. 2. Provide a code analysis indicating the construction type, occupancy group within the occupancy classification. List the occupant load factor used to determine the number of occupants. Are there fire sprinklers installed? If so what type? IBC 107.2.1 3. Provide drawing details or otherwise indicate how this meets the accessibility requirements of IEBC section 305. For example, seating, kitchen, bathrooms, etc. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
|||
Commercial Electrical | REVIEW COMPLETED | There are no construction plans loaded into BlueBeam for review. | |||
Commercial Mechanical | REVIEW COMPLETED | ||||
Commercial Plumbing | REVIEW COMPLETED | ||||
Design Review | REVIEW COMPLETED | REVIEW NOT COMPLETED BY DUE DATE. Add 'Design Review' to Interim Review step if added. | |||
Fire New Construction | REVIEW COMPLETED | No comments at this time | |||
Historic | REVIEW COMPLETED | Parcel is located within the Sunshine Mile National Register Historic District and outside of an Archaeological Sensitivity Zone. A portion of the parcel was previously surveyed in anticipation of purchase 2001. Historic review not required. | |||
ROW Engineering Review | REVIEW COMPLETED | No comments for temporary Fire Station. | |||
Signs | REVIEW COMPLETED | No comments at this time. | |||
Site Engineering | REVIEW COMPLETED | Site Engineering has no comments | |||
Site Landscape | REVIEW COMPLETED | SITE LANDSCAPE/NPPO SECTION COMMENTS: 1. Can an updated landscape plan be provided that includes filling in the existing street landscape borders with the required number of trees and groundcover along E Broadway BL and N Park Av? 2. Can an updated irrigation plan be provided? 3. Depress the street landscape border planting areas 6 and 9 inches to maximize rainwater harvesting. If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov |
|||
Site Zoning | REVIEW COMPLETED | REVIEW NOT COMPLETED BY DUE DATE. Add 'Site Zoning' to Interim Review step if added. | |||
Traffic Engineering Review | REVIEW COMPLETED | Traffic Engineering review complete - no comments | |||
Water - PDSD | REVIEW COMPLETED | ||||
Zoning Modifications - DDO | REVIEW COMPLETED | Pending on zoning review comments, a DDO may or may not be required for the project. Email Mark.Castro@tucsonaz.gov if you have questions. | |||
Zoning Modifications - IPP | REVIEW COMPLETED | Pending on zoning review comments, an IPP may or may not be required for the project. Email Mark.Castro@tucsonaz.gov if you have questions. | |||
Zoning Modifications - MS&R | REVIEW COMPLETED | Pending on zoning review comments, a MS&R modification request may or may not be required for the project. Email Mark.Castro@tucsonaz.gov if you have questions. | |||
Zoning Modifications - Variance | REVIEW COMPLETED | Pending on zoning review comments, a variance may or may not be required for the project. Email Mark.Castro@tucsonaz.gov if you have questions. |