Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 10 N PARK AV
Search
Parcel Attributes
Parcel | 124062350 124062370 124062380 124062390 124062400 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | C-3 |
Tucson Ward | Ward 6 |
Rio Nuevo Multipurpose Facilities District | Yes |
Tucson Registered Neighborhood | Rincon Heights |
Major Streets & Routes | Gateway Route |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Annexations & Original City Zoning (OCZ)
Address: 10 N PARK AV
Date - 11/21/2024 8:07 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
---|---|---|---|---|
3/4 Mile East To Campbell Avenue | 486 | None |
Rezoning Cases
Date - 11/21/2024 8:07 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-20-11 | Sunshine Mile UOD | Ordinanced | 10/20/2020 |
Permits
Address: 10 N PARK AV
Date - 11/21/2024 8:07 p.m.
Total Number Of Permits - (15)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-COM-1124-02115 | Awaiting Submittal | 11/04/2024 | 05/03/2025 | Commercial Building | Fence Permit for the construction temporary facility for Fire Station 3 operations while new station is being constructed. Work includes fence around site. | |
TC-FBB-1124-00193 | Awaiting Submittal | 11/04/2024 | N/A | Factory Built Buildings | Construct temporary facility for Fire Station 3 operations while new station is being constructed. Work includes remodel of modular trailer and installation of utilities to the modular unit including: electrical service, water and sewer. | |
TC-UTL-1124-00098 | Awaiting Submittal | 11/04/2024 | 05/03/2025 | Utilities Permit | Utility Permit for the construction of the temporary facility for Fire Station 3 operations while new station is being constructed. Work includes remodel of modular trailer and installation of utilities to the modular unit including: electrical service, water and sewer. | |
C10-04-19 | WITHDRWN | 12/31/2008 | N/A | LUCAPHST | C10-04-19 OUR TOWN YOUTH CENTER The applicant's site is an 11,900 square foot lot with an existing structure. The applicant proposes a change of use to a Membership Organization Use. The applicant is requesting the following variances: 1) Reduce the setback from the west lot line from twenty-eight feet six inches (28'6") to zero (0') feet; 2) Reduce the setback from the north lot line from twenty-eight feet six inches (28'6") to seventeen (17') feet; 3) Reduce the number of motor vehicle parking spaces from 171 spaces to 1 space; 4) Delete the one required twelve (12') foot by thirty-five (35') foot loading space; 5) Allow vehicular maneuvering directly into the right of way from the parking/drop off area; 6) Delete street landscape and screen requirements; 7) Delete landscaping in vehicle use areas; and, 8) Delete screening for refuse storage area. DECISION: Variances 1, 2, 3, 4, 5, 6, 7 and 8: Denied | |
T01EL00750 | EXPIRED | 03/30/2001 | 10/01/2001 | ELECT | ELECTRIC:RECONNECT BUSINESS TWO METERS | |
T04EL02119 | FINAL | 10/18/2004 | 11/07/2005 | ELECT | RECONNECT:ELECTRIC:STORAGE | |
T04OT00804 | WITHDRWN | 04/19/2004 | N/A | SITE | SITE ONLY | |
T04PL01974 | FINAL | 11/04/2004 | 05/18/2005 | PLUMB | RECONNECT:GAS LINE | |
T05EL00954 | FINAL | 05/10/2005 | 11/07/2005 | ELECT | ELECTRIC SERVICE FOR EVP COOLERS | |
T05ME00126 | FINAL | 03/10/2005 | 11/30/2005 | MECH | REPLACE:FURNACE | |
T17BU00482 | EXPIRED | 10/12/2017 | 07/08/2018 | DEMO | COMMERCIAL BUILDING DEMO | |
T18RW00049 | FINAL | 01/02/2018 | 02/02/2018 | ROW | (2) 5X5 bellholes in blktop alley-- to repair/replace gas line | |
T18RW00117 | FINAL | 01/04/2018 | 02/07/2018 | ROW | 15 LF FRONT ASPHALT TO REMOVE WATER VALVE | |
T18TUP0006 | CLOSED | 04/09/2018 | N/A | TUP | Temporary Storage Yard | |
T19RW01644 | FINAL | 03/26/2019 | 05/28/2019 | ROW | 142ft of trenching, asphalt and concrete removal on N Park Ave (south of 10th St). Also placement of new 3048 HH and 48TA MH. |
Plans
Address: 10 N PARK AV
Date - 11/21/2024 8:07 p.m.
Total Number Of Plans - (1)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CIP-0724-00024 | Needs Resubmittal | 07/24/2024 | N/A | -- (CIP) Commercial Structure | Construct temporary facility for Fire Station 3 operations while new station is being constructed. Work includes remodel of modular trailer and installation of utilities to the modular unit including: electrical service, water and sewer. |