#26-0649 - Tucson - Zone 246 Total Estimated Linear Feet (Excavation/Bore): 14,661 feet Serviceable Locations - 404 Project Scope & Overview Installation of new fiber-optic infrastructure within the City of Tucson public right-of-way (ROW) to support local telecommunications and high-speed broadband expansion. Construction activity includes underground conduit installation, vault/handhole placement, fiber placement, overhead pole attachment where applicable, and site restoration. Detailed Work Plan Underground Excavation & Installation Directional Boring (Trenchless): Placement of high-density polyethylene (HDPE) conduit via horizontal directional drilling (HDD) to minimize surface disruption. Open Trenching / Micro-Trenching: Excavation for conduit installation where directional boring is not feasible. All trenching and backfill will strictly adhere to City of Tucson Chapter 25 Code, Standard Details, and D.S. 3-03 Pavement Cut Requirements. City of Tucson Structures: Installation of flush-to-grade composite underground vaults and handholes at designated splice locations and lateral tie-ins. Aerial Operations (If Applicable) Attachment of fiber optic cable and strand to existing utility poles in accordance with signed pole attachment agreements and City requirements. No remaining on abandoned poles. City of Tucson Traffic Control & Safety Implementation of temporary traffic control, lane closures, or sidewalk detours in full compliance with the Manual on Uniform Traffic Control Devices (MUTCD), City Code Chapter 25, and approved City of Tucson Department of Transportation & Mobility (DTM) Barricade and Excavation Permits. City of Tucson Utility Coordination & Underground Safety Pre-construction utility locates will be coordinated through Arizona 811. Work occurring near Tucson Water infrastructure will maintain required horizontal clearances and comply with Tucson Water Distribution Design guidelines. Restoration & Site Clean-Up All impacted asphalt, concrete, sidewalks, curbs, ADA ramps, and landscaping will be restored to original or better condition per City of Tucson standard details. Asphalt patches will meet City pavement cut restoration standards. Quantities & Location Details Number of Vaults/Handholes: Service Pedestal - 96 Vault - 10 24" x 36" - 8 36" x 48" - 0 15" x 24" - 2 10” Flower Pot - 3 Project Location/Limits: E 22nd St to E 29th St and between S Country Club Rd to S Palo Verde Ave. This plan consists of 3 permit sections = 3 ROW Fiber permits will be applied for upon approval of this plan. PLEASE SEE ATTACHED SITE PLANS AND TCP FOR BETTER DETAILS
Architects:
- Ideatek
- IdeaTek Telcom LLC
Contractors:
Plan Reviews
Plan Number - TR-FTTP-1126-00040
Plan Status: In Review
Plan Description: #26-0649 - Tucson - Zone 246
Total Estimated Linear Feet (Excavation/Bore): 14,661 feet
Serviceable Locations - 404
Project Scope & Overview
Installation of new fiber-optic infrastructure within the City of Tucson public right-of-way (ROW) to support local telecommunications and high-speed broadband expansion. Construction activity includes underground conduit installation, vault/handhole placement, fiber placement, overhead pole attachment where applicable, and site restoration.
Detailed Work Plan
Underground Excavation & Installation
Directional Boring (Trenchless): Placement of high-density polyethylene (HDPE) conduit via horizontal directional drilling (HDD) to minimize surface disruption.
Open Trenching / Micro-Trenching: Excavation for conduit installation where directional boring is not feasible. All trenching and backfill will strictly adhere to City of Tucson Chapter 25 Code, Standard Details, and D.S. 3-03 Pavement Cut Requirements.
City of Tucson
Structures: Installation of flush-to-grade composite underground vaults and handholes at designated splice locations and lateral tie-ins.
Aerial Operations (If Applicable)
Attachment of fiber optic cable and strand to existing utility poles in accordance with signed pole attachment agreements and City requirements. No remaining on abandoned poles.
City of Tucson
Traffic Control & Safety
Implementation of temporary traffic control, lane closures, or sidewalk detours in full compliance with the Manual on Uniform Traffic Control Devices (MUTCD), City Code Chapter 25, and approved City of Tucson Department of Transportation & Mobility (DTM) Barricade and Excavation Permits.
City of Tucson
Utility Coordination & Underground Safety
Pre-construction utility locates will be coordinated through Arizona 811. Work occurring near Tucson Water infrastructure will maintain required horizontal clearances and comply with Tucson Water Distribution Design guidelines.
Restoration & Site Clean-Up
All impacted asphalt, concrete, sidewalks, curbs, ADA ramps, and landscaping will be restored to original or better condition per City of Tucson standard details. Asphalt patches will meet City pavement cut restoration standards.
Quantities & Location Details
Number of Vaults/Handholes:
Service Pedestal - 96
Vault - 10
24" x 36" - 8
36" x 48" - 0
15" x 24" - 2
10” Flower Pot - 3
Project Location/Limits: E 22nd St to E 29th St and between S Country Club Rd to S Palo Verde Ave. This plan consists of 3 permit sections = 3 ROW Fiber permits will be applied for upon approval of this plan.
PLEASE SEE ATTACHED SITE PLANS AND TCP FOR BETTER DETAILS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/06/2026 | Right of Way Review v.1 | IN REVIEW |