Plan Details

Status:
Needs resubmittal
Type:
Fiber Plan Review
Address:
2762 S KOLB RD

Apply Date:
08/07/2026
Applicant:
Evan
Description:
Ideatek is Expanding Fiber Optic Cable Network in Tucson. This backbone fiber be placed in Tucson Road Right of Way. Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 96ct up 432ct and pulled through duct. Vault and service pedestals to be placed along route to serve as splicing points. Scope of work involved: E Stella Rd, S Kolb Rd, E Golf Links Rd, S Sahara Ave, E 22nd St.
Architects:
  • Ideatek
  • IdeaTek Telcom LLC
Contractors:

Plan Reviews

Plan Number - TR-FTTP-0826-00007
Plan Status: Needs Resubmittal
Plan Description: Ideatek is Expanding Fiber Optic Cable Network in Tucson. This backbone fiber be placed in Tucson Road Right of Way. Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 96ct up 432ct and pulled through duct. Vault and service pedestals to be placed along route to serve as splicing points. Scope of work involved: E Stella Rd, S Kolb Rd, E Golf Links Rd, S Sahara Ave, E 22nd St.
Start Date Submittal Complete Date Status  
08/07/2026 Pre-Application Conference Review v.1 REQUIRES RESUBMIT Review Details
08/07/2026 Pre-Application Conference Review v.1 VOID Review Details
08/07/2026 Right of Way Review v.1 IN REVIEW Review Details