Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Details

Status:
Active
Type:
Basin
Apply Date:
07/19/2023
Applicant:
Jeff
Description:
Basin B4, North and Northeast corner of site, East of TE-BAS-0723-00091, between right and middle driveway entrance
Architects:
  • Brinkmann Constructors
  • EPS Group
  • Flint Development
Contractors:

Outstanding Inspections

Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
08/24/2023 COT - BASN - Drainage/Basin - Condition Inspection Basin - Fair Under construction
01/08/2024 COT - BASN - Drainage/Basin - Annual Inspection - Recur Basin - Fair Basin in the rear of the property and sections of the drainage channel are not in compliance with city specs.
Allowable time frame for water to sit in either area would be 12 to 24 hrs.
Engineer should evaluate and suggest a direction for repair or mitigation.

Documents

File Name Document Type  
BASIN PLANS.PDF DOCUMENTS VIEW