Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Details

Status:
Active
Type:
Basin
Apply Date:
07/19/2023
Applicant:
Jeff
Description:
Basin B3, North side of site, East of TE-BAS-0723-00090, between the western and middle driveway entrance
Architects:
  • Brinkmann Constructors
  • EPS Group
  • Flint Development
Contractors:

Scheduled Inspections

Plan Number - TE-BAS-0723-00091
Plan Status: Active
Plan Description: Basin B3, North side of site, East of TE-BAS-0723-00090, between the western and middle driveway entrance
Total Scheduled Inspections - 1
Scheduled Date Description Inspector Status
10/01/2024 COT - BASN - Drainage/Basin - Annual Inspection - Recur Scheduled

Outstanding Inspections

Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/03/2024 COT - BASN - Drainage/Basin - Condition Inspection Basin - Poor Basin is getting worse and holding water longer each time it rains. Water this time is 8 to 12 inches deep and not draining out of basin. No heavy rain since Saturday night. Pictures in file.
02/05/2024 COT - BASN - Drainage/Basin - Annual Inspection - Recur Basin - Poor 3780 Valencia, Basin holding water 56 hours after the last rain, channel is also holding water.

6690 Alvernon, both channel and basin is holding water 56 hours after last rain. Sever erosion to grade at the north west corner of the building.

Documents

File Name Document Type  
BASIN PLANS.PDF DOCUMENTS VIEW