Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: TE-BAS-0723-00091
Plan Details
Apply Date:
07/19/2023
Applicant:
Jeff
Description:
Basin B3, North side of site, East of TE-BAS-0723-00090, between the western and middle driveway entrance
Architects:
- Brinkmann Constructors
- EPS Group
- Flint Development
Contractors:
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2024 | COT - BASN - Drainage/Basin - Condition Inspection | Basin - Poor | Basin is getting worse and holding water longer each time it rains. Water this time is 8 to 12 inches deep and not draining out of basin. No heavy rain since Saturday night. Pictures in file. |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/11/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | No concerns at this time |