Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Details

Status:
In review
Type:
Private Improvement Agreement
Apply Date:
10/05/2021
Applicant:
Tri
Description:
Bella Tierra Phase 3, Paving Improvement plans, Lots 1-78 - containing new roads of Indigo Bluff Street, Red Bluff Court, Verdin Valley Drive, White Bluff Court, and new portions of Brandywine Drive and Wingate Boulevard, and a modification to Irvington Road at Wingate Blvd - includes new pavement, curb, sidewalk, ramps, scuppers, and drainage
Architects:
  • KB Home
  • RICK Engineering
  • Rick Engineering Company, Inc.
Contractors:

Outstanding Plan Activity Conditions

Plan Number - T21PI00013
Plan Description: Bella Tierra Phase 3, Paving Improvement plans, Lots 1-78 - containing new roads of Indigo Bluff Street, Red Bluff Court, Verdin Valley Drive, White Bluff Court, and new portions of Brandywine Drive and Wingate Boulevard, and a modification to Irvington Road at Wingate Blvd - includes new pavement, curb, sidewalk, ramps, scuppers, and drainage
Date Name Approved Comments
11/22/2023 THIS DOES NOT APPLY Not Approved THIS DOES NOT APPLY
11/22/2023 THIS DOES NOT APPLY Not Approved THIS DOES NOT APPLY

Outstanding Inspections

Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/10/2024 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) Re-inspection required The punch list for this site has been put together and has been sent to appropriate parties. Once the developer, KB Homes, addresses the areas identified to be replace, repaired, or finally installed, we can return to get the final approval.

Plan Reviews

Plan Number - T21PI00013
Plan Status: In Review
Plan Description: Bella Tierra Phase 3, Paving Improvement plans, Lots 1-78 - containing new roads of Indigo Bluff Street, Red Bluff Court, Verdin Valley Drive, White Bluff Court, and new portions of Brandywine Drive and Wingate Boulevard, and a modification to Irvington Road at Wingate Blvd - includes new pavement, curb, sidewalk, ramps, scuppers, and drainage
Start Date Submittal Complete Date Status  
03/01/2022 PIA - SUBMITTAL 03/31/2022 COMPLETED Review Details
10/05/2021 PIA - SUBMITTAL 11/18/2021 COMPLETED Review Details
12/28/2023 Private Improvement Agreement Review v.1 APPROVED Review Details

Documents

File Name Document Type  
1_5074_BT3_PIA PAV_2023-12-28_V1_V1.PDF DOCUMENTS VIEW