Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: T21PI00013
Plan Details
Apply Date:
10/05/2021
Applicant:
Tri
Description:
Bella Tierra Phase 3, Paving Improvement plans, Lots 1-78 - containing new roads of Indigo Bluff Street, Red Bluff Court, Verdin Valley Drive, White Bluff Court, and new portions of Brandywine Drive and Wingate Boulevard, and a modification to Irvington Road at Wingate Blvd - includes new pavement, curb, sidewalk, ramps, scuppers, and drainage
Architects:
- KB Home
- RICK Engineering
- Rick Engineering Company, Inc.
Contractors:
Outstanding Plan Activity Conditions
Plan Number - T21PI00013
Plan Description: Bella Tierra Phase 3, Paving Improvement plans, Lots 1-78 - containing new roads of Indigo Bluff Street, Red Bluff Court, Verdin Valley Drive, White Bluff Court, and new portions of Brandywine Drive and Wingate Boulevard, and a modification to Irvington Road at Wingate Blvd - includes new pavement, curb, sidewalk, ramps, scuppers, and drainage
Date | Name | Approved | Comments |
---|---|---|---|
11/22/2023 | THIS DOES NOT APPLY | Not Approved | THIS DOES NOT APPLY |
11/22/2023 | THIS DOES NOT APPLY | Not Approved | THIS DOES NOT APPLY |
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/10/2024 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Re-inspection required | The punch list for this site has been put together and has been sent to appropriate parties. Once the developer, KB Homes, addresses the areas identified to be replace, repaired, or finally installed, we can return to get the final approval. |
Plan Reviews
Plan Number - T21PI00013
Plan Status: In Review
Plan Description: Bella Tierra Phase 3, Paving Improvement plans, Lots 1-78 - containing new roads of Indigo Bluff Street, Red Bluff Court, Verdin Valley Drive, White Bluff Court, and new portions of Brandywine Drive and Wingate Boulevard, and a modification to Irvington Road at Wingate Blvd - includes new pavement, curb, sidewalk, ramps, scuppers, and drainage
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/01/2022 | PIA - SUBMITTAL | 03/31/2022 | COMPLETED |
10/05/2021 | PIA - SUBMITTAL | 11/18/2021 | COMPLETED |
12/28/2023 | Private Improvement Agreement Review v.1 | APPROVED |