Plan Details

Status:
Complete
Type:
Private Improvement Agreement
Apply Date:
12/16/2020
Applicant:
Unknown
Description:
La Estancia Phase II - Offsite 4 - I-2020-029
Architects:
  • DennisRoberts
  • MTadeo
Contractors:

Outstanding Plan Activity Conditions

Plan Number - T20PI00026
Plan Description: La Estancia Phase II - Offsite 4 - I-2020-029
Date Name Approved Comments
07/10/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. Not Approved Not Needed
07/10/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. Not Approved T22CM07054

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 2
Date Description Inspector Results Comments
07/31/2023 TRSP - PIA - Signage/Striping Final Passed On July 31st 2023 City of Tucson Traffic Engineering inspected the project that you proposed for acceptance. Currently your Traffic Engineering obligation to the Private Improvement Agreement contract has
been adequately met and approved.

I will forward recommendation of your project approval to TDOT P&C.

Thank You,

Arthur Hernandez
Traffic Engineering Technician
09/19/2025 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) Passed The paving repair that took place today on E Via Olmeda right before intersecting with S Caminito Dos Manos was completed. The crew that was present here paving the street are from KE&G, they began removing the area that needed to be repaired at 6:10am and once the truck arrived at 8:10am they began paving. The mix came from the Granite Swan Plant and the material code was 13700 with the total tonnage coming out to 22.12 tons, the thickness of the asphalt was placed at 2 1/2" near the crown and 3" on either side of the wedge curb. The asphalt was temp from the back of the paving machine was coming out to 290 degrees. The crew had finished the paving process by 9:00am.

Plan Reviews

Plan Number - T20PI00026
Plan Status: Complete
Plan Description: La Estancia Phase II - Offsite 4 - I-2020-029
Start Date Submittal Complete Date Status  
09/25/2026 Private Improvement Agreement Review v.1 APPROVED Review Details

Documents

File Name Document Type  
PARCEL 4 OFFSITE PAVING I-2020-029-BB_V1.PDF DOCUMENTS VIEW