Plan: T20PI00026

Parcel: 141432070

Inspection Status: Passed

Inspection History: TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance)

Date Description Inspector Results Comments
09/16/2025 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) Passed This was a repair for the roadway on E Camino Rebina and S Caminito Mambla. The roadway area was cut according to the spec, with it being from curb to curb. The mix was is from the Granite asphalt plant on Swan, the total tonnage came out to 20.34 tons with the mix design being 13700.
09/19/2025 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) Passed The paving repair that took place today on E Via Olmeda right before intersecting with S Caminito Dos Manos was completed. The crew that was present here paving the street are from KE&G, they began removing the area that needed to be repaired at 6:10am and once the truck arrived at 8:10am they began paving. The mix came from the Granite Swan Plant and the material code was 13700 with the total tonnage coming out to 22.12 tons, the thickness of the asphalt was placed at 2 1/2" near the crown and 3" on either side of the wedge curb. The asphalt was temp from the back of the paving machine was coming out to 290 degrees. The crew had finished the paving process by 9:00am.