Plan: T20PI00021
Plan Details
Apply Date:
11/23/2020
Applicant:
Gregory
Description:
La Estancia Phase 2 Offsite 3 -I-2020-022
Architects:
- DennisRoberts
- MTadeo
- Sunbelt Holdings
Contractors:
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2023 | TRSP - PIA - Signage/Striping Final | Basin - Good | ||
| 09/15/2026 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | A final walkthrough of the job site revealed no major issues that would need to be addressed before the final inspection can pass. Any areas where the sidewalk or curb were damaged or failed in any way has been replaced or repaired. The pavement is smooth and without any major defects. The drive surface is free of cracks and potholes. All utilities have been raised to the surface and finished with concrete. |
Plan Reviews
Plan Number - T20PI00021
Plan Status: Needs Resubmittal
Plan Description: La Estancia Phase 2 Offsite 3 -I-2020-022
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2026 | Private Improvement Agreement Review v.1 | REQUIRES RESUBMIT |