Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance)
| Date |
Description |
Inspector |
Results |
Comments |
| 09/15/2026 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
|
Passed |
A final walkthrough of the job site revealed no major issues that would need to be addressed before the final inspection can pass. Any areas where the sidewalk or curb were damaged or failed in any way has been replaced or repaired. The pavement is smooth and without any major defects. The drive surface is free of cracks and potholes. All utilities have been raised to the surface and finished with concrete. |