Status:
Approved
Type:
Land Division
Address:
1826 W KING AV

Apply Date:
02/22/1999
Applicant:
Unknown
Description:
REGALO DEL SOL
Architects:
  • City of Tucson DTM Streets and Traffic Maintenance
  • MW2 DEVELOPMENT INC
  • Title Security Agency, LLC, a Delaware limited liability com. trust 202065-S as trustee, Ronda Tatro
Contractors:

Outstanding Inspections

Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/26/2009 TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) Re-inspection required {Activity date: 01/26/2009; Status: Denied; Inspector: TSTOCKET; Comment: Entered by KMEDINA1 - SEE SIRE FOR PUNCH LIST}
06/25/2009 COT - ENGR - Site - Assurance Release Partial Pass {Activity date: 06/25/2009; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - LOTS #5 AND #6 CAN BE RELEASED AT THIS TIME, THE REQUIRED DRIVEWAY REPAIRS HAVE BEEN COMPLETED AT THIS TIME.} ; {Activity date: 05/22/2009; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE WAS CHECKED FOR THE INITIAL RELEASE OF THE ASSURANCES AND HAS BEEN FOUND TO BE COMPLETE FOR THE INITIAL RELEASE. THE REQUESTED LOTS (5 & 6) CANNOT BE RELEASED AT THIS TIME UNTIL THE FOLLOWING ITEMS ARE ADDRESSED. THE SIDEWALKS FOR THE SITE HAVE BEEN POURED BUT HAVE BEEN POURED INCORRECTLY. BEFORE ANY OF THE LOTS (1 - 6) CAN BE APPROVED ALL DRIVEWAYS WILL HAVE TO BE RE-POURED. I WILL RE-INSPECT THIS SITE FOR THE RELEASE OF THESE LOTS ONCE THE DRIVE WAYS HAVE BEEN POURED CORRECTLY. ALL OTHER LOTS WILL BE RE-INSPECTED PRIOR TO APPROVING ADDITIONAL RELEASES. IF THERE ARE ANY QUESTIONS PLEASE FEEL FREE TO CONTACT DAVID ROBERTS AT 837-4992 AND 349-7643, LEAVE A MESSAGE IF I AM NOT IN OR AVAILABLE.}

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
Date Description Inspector Results Comments
08/12/1999 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/12/1999; Status: APPR; Inspector: JONEILL; Comment: Entered by JVOGELSB - APPROVED} ; {Activity date: 03/15/1999; Status: Correction Required; Inspector: JONEILL; Comment: Entered by JVOGELSB - CORRECTION REQUIRED}
12/03/1999 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/03/1999; Status: Approved; Inspector: JONEILL; Comment: Entered by LJACKSO1 - } ; {Activity date: 08/12/1999; Status: Correction Required; Inspector: JONEILL; Comment: Entered by JVOGELSB - CORRECTION REQUIRED} ; {Activity date: 08/12/1999; Status: Correction Required; Inspector: JONEILL; Comment: Entered by JVOGELSB - ADDTL COMMS - oneill: need 5 high wall n&e p.l.}
02/04/2009 COT - WATR - Design Plan Construction Passed {Activity date: 02/04/2009; Status: Approved; Inspector: LHERNAND; Comment: Entered by KMEDINA1 - SEE SIRE FOR APPROVAL LETTER}
02/05/2009 SPECIAL INSPECTION - OTHER (Third Party) Passed {Activity date: 02/05/2009; Status: Approved; Inspector: RMONTOYA; Comment: Entered by KMEDINA1 - SEE SIRE FOR APPROVAL LETTERS}

Documents

File Name Document Type  
ASSURANCE AND RELEASE LOG.XLS ASSURANCES VIEW
ASSURANCE COMMENT SHEET ASSURANCES VIEW
SUBSTITUTE AGREEMENT 2008_04_18 ASSURANCES VIEW
ORIGINAL AGREEMENT 18526 ASSURANCES VIEW
RELEASE LETTER 2010_02_22.PDF ASSURANCES VIEW
RELEASE LETTER 2009_11_12.PDF ASSURANCES VIEW
RELEASE LETTER 2009_10_28R.PDF ASSURANCES VIEW
RELEASE LETTER 2009_10_08.PDF ASSURANCES VIEW
RELEASE LETTER 2009_06_30.PDF ASSURANCES VIEW
RELEASE LETTERS 2008.PDF ASSURANCES VIEW
INSPECTION 2009_01_26.TIF ASSURANCES VIEW
WATER INSPECTION 2009_02_04.TIF ASSURANCES VIEW
WASTEWATER INSPECTION 2009_02_05.PDF ASSURANCES VIEW
NOTICE OF TRUSTEE SALE.PDF ASSURANCES VIEW