Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: S99-006

Parcel: 118061220


Addresses:

1826 W KING AV


Inspection Status: Partial Pass

Inspection History: TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance)

Plan Number - S99-006

Inspection Description - TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance)

Inspection Status - Partial Pass

Date Description Inspector Results Comments
01/09/2009 TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) THARVISO Partial Approval Entered by THAUSER1 - I-2000-059 THIS OFFICE HAS INSPECTED REGALO DEL SOL ESTATES, LOTS 1-11 AND FOUND THE PROJECT COMPLETED AND IN SUBSTANTIAL CONFORMANCE. THE ENGINEER-OF-RECORD MUST SUBMIT THE ORIGINAL "AS-BUILT" MYLARS SHOWING ANY REVISIONS AND/OR CHANGES TO LINE AND GRADE PRIOR TO ACCEPTANCE BY THE CITY OF TUCSON FOR MAINTENANCE AND OPERATION. ADDITIONALLY, THE PRIVATE IMPROVEMENT AGREEMENT (PIA) REQUIRES THE OWNER/DEVELOPER TO PAY ANY APPLICABLE FEES FOR ONSITE ROADWAY SURFACE TREATMENT (AT A MINIMUM FOG COAT). AN OFFSITE ROADWAY SURFACE TREATMENT MAY BE REQUIRED DEPENDING ON FIELD CONDITIONS. PLEASE SUBMIT FOG COAT FEES OF $8085.00. THE FEES SHALL BE PAID TO THE CITY OF TUCSON, DEPARTMENT OF TRANSPORTATION (DOT). THE CITY OF TUCSON, ENGINEERING DIVISION WILL ISSUE A LETTER OF ACCEPTANCE AFTER RECEIVING THE ORIGINAL "AS-BUILT" MYLARS AND APPLICABLE SURFACE TREATMENT FEES.
01/26/2009 TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) TSTOCKET Denied Entered by KMEDINA1 - SEE SIRE FOR PUNCH LIST