Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: S98-056
Plan Details
Apply Date:
10/22/1998
Applicant:
Shawn
Description:
DAYSTAR ESTATES
Architects:
- City of Tucson DTM Streets and Traffic Maintenance
- DAVID L LAM
- OLD PUEBLO COMMUNITY SERVICES
- STEWART TITLE AND TRUST OF TUCSON
- Title Security Agency, LLC, a Delaware limited liability com. trust 202065-S as trustee, Ronda Tatro
Contractors:
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/28/1999 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 09/28/1999; Status: APPR; Inspector: JONEILL; Comment: Entered by JVOGELSB - APPROVED} ; {Activity date: 11/16/1998; Status: Correction Required; Inspector: PTHOMAS; Comment: Entered by JVOGELSB - CORRECTION REQUIRED} | |
06/07/2000 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 09/28/1999; Status: Correction Required; Inspector: JONEILL; Comment: Entered by JVOGELSB - CORRECTION REQUIRED} ; {Activity date: 11/16/1998; Status: Correction Required; Inspector: PTHOMAS; Comment: Entered by JVOGELSB - CORRECTION REQUIRED} | |
09/19/2005 | COT - WATR - Design Plan Construction | Passed | {Activity date: 09/19/2005; Status: Approved; Inspector: LHERNAND; Comment: Entered by JFEMLIN1 - Water approved} | |
09/26/2007 | SPECIAL INSPECTION - OTHER (Third Party) | Passed | {Activity date: 09/26/2007; Status: Approved; Inspector: SRAVAL; Comment: Entered by THAUSER1 - G-1999-125} | |
04/07/2021 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 04/07/2021; Status: Approved; Inspector: RL; Comment: Entered by RLEIGH1 - } ; {Activity date: 02/28/2018; Status: Denied; Inspector: TOM; Comment: Entered by DROBERT5 - From: Tom Adkins <Tom.Adkins@tucsonaz.gov> To: David Roberts <David.Roberts@tucsonaz.gov> Cc: David Stiffey <David.Stiffey@tucsonaz.gov>, Richard Leigh <Richard.Leigh@tucsonaz.gov> Bcc: Date: Fri, 23 Feb 2018 09:30:30 -0700 Subject: Daystar Estates Dave, Per your request, I inspected the subject PIA project to check for compliance with TDOT standards for final acceptance and found the following issues: 1. Asphalt has shrinkage cracks throughout project that need sealing on both Mariah Joy Place and Treighton Jon Place. 2. Sidewalk from approx. Lot 17 to Lot 13 is not compliant with ADA requirements for cross slope. 3. Blue RPM needed at fire hydrant adjacent to Lot 21. 4. Lots 11 & 12 have no expansion joint at driveways. 5. Private retaining wall at Lot 9 is about 1' inside of Right of Way 6. Lot 21 has a heaved portion of sidewalk causing trip hazard. 7. Blue RPM needed at fire hydrant adjacent to Lot 6. Hydrant valve in street needs concrete collar. 8. Concrete spillway adjacent to Lot 8 was built with gabions. This was not as-built on the plan. 9. Barricade railing across subject spillway was not installed as per plan requirements. Please let me know if I can be of further assistance,} |
|
07/13/2001 | COT - ENGR - Site - Assurance Release | Passed |