Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: S19-039
Plan Details
Apply Date:
06/07/2019
Applicant:
Kelly
Description:
BELLA TIERRA 1A&1B LOTS 1-227
Architects:
- KB Home
- KB Home Division
- KB home land department
- Kent.Groh
- RICK Engineering
- WARREN.THOMPSON
Contractors:
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/19/2023 | COT - ENGR - Site - Assurance Release | Not Ready | Full & Final Release for Phase 1A & 1B requested. - All Lots and common areas. I met with Jake from KB homes to discuss things that will probably be needed for the site prior to doing a full release of the Subdivision Provide this department, a copy of the Revised Landscape Plans and drawings for the site to be utilized for the Final Inspection. Once this inspection has been performed, we will then look at can we consider in Full release of all lots blocks and common areas for the Subdivision. |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/12/2023 | SPECIAL INSPECTION - Pima County Sewer (Third Party) | Passed | ||
05/12/2023 | COT - WATR - Design Plan Construction | Passed | ||
05/12/2023 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | Passed |
Plan Reviews
Plan Number - S19-039
Plan Status: Assurances
Plan Description: BELLA TIERRA 1A&1B LOTS 1-227
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/09/2019 | SUBPLAT- OK TO SUBMIT | 06/11/2019 | COMPLETED |
06/08/2020 | FINAL PLAT - PACKAGE | 06/12/2020 | COMPLETED |
06/12/2019 | FINAL PLAT - REVIEW | 07/17/2019 | COMPLETED |
09/27/2019 | FINAL PLAT - REVIEW | 10/31/2019 | COMPLETED |