Plan: S19-014
Plan Details
Apply Date:
02/26/2019
Applicant:
KEN PERRY, PE
Description:
SUBC
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2019 | ASSURANCE - PC WASTEWATER | AH | Approved | **See attachment in documents table in PRO.** Attached is the Final Acceptance Letter for Las Cabanas Lots 1-15 G-2019-003 / P19WP00037. Thank you, Denice Elie Civil Engineer Assistant PCRWRD 520-724-6369 |
| 10/03/2019 | ASSURANCE - UTILITY SERVICES | AH | Approved | **See attachment in documents table on PRO.** Attached is the Final Inspection and Acceptance memo, plus map, for the above project. Beth Moore Tucson Water, P&E Construction Section (520) 837-2100 |
| 06/29/2020 | ASSURANCE - DOT TRAFFIC | RLEIGH | Approved | |
| 06/29/2020 | ASSURANCE - DOT PERMITS & CODE | RLEIGH | Approved | |
| 10/13/2020 | ASSURANCE - DSD | DROBERTS | Approved |