Plan: S19-014

Parcel: 112020170


Addresses:

3645 N TUCSON BL

Inspection Status: Approved

Inspection History: ASSURANCE - DSD

Date Description Inspector Results Comments
10/13/2020 ASSURANCE - DSD Approved
09/18/2020 ASSURANCE - DSD Partial Approval partially approved, lots 10 and 13 OK for release.
09/18/2020 ASSURANCE - DSD Partial Approval partially approved, lots 10 and 13 OK for release.
09/18/2020 ASSURANCE - DSD Partial Approval OK TO RELEASE LOT #10. HAVE ASKED THE CONTRACTOR TO CHECK ALL OF THE LANDSCAPING ON THIS SITE AND LET ME KNOW IF IT IS COMPLETED.
08/27/2020 ASSURANCE - DSD Partial Approval PARTIAL AT THIS TIME, THIS SITE IS NOT READY FOR THE FULL RELEASE AT THIS TIME. COMPLETE THE LANDSCAPING AS SHOWN ON THE APPROVED PLAN, THERE APPEAR TO BE MISSING PLANTS AND TREES AT VARIOS LOCATIONS WITH THIS SITE. COMPLETE ALL SIDEWALKS FOR THE REMAINING 5 LOTS PRIOR TO REQUEST A FULL AND FINAL RELEASE OF THIS SITE.
08/27/2020 ASSURANCE - DSD Partial Approval PARTIAL AT THIS TIME, THIS SITE IS NOT READY FOR THE FULL RELEASE AT THIS TIME. COMPLETE THE LANDSCAPING AS SHOWN ON THE APPROVED PLAN, THERE APPEAR TO BE MISSING PLANTS AND TREES AT VARIOS LOCATIONS WITH THIS SITE. COMPLETE ALL SIDEWALKS FOR THE REMAINING 5 LOTS PRIOR TO REQUEST A FULL AND FINAL RELEASE OF THIS SITE.
06/04/2020 ASSURANCE - DSD Partial Approval IS PARTIAL AT THIS TIME, FINAL NOT TO GIVEN TILL MORE OF THE SITE IS COMPLETE. ENSURE THAT ALL OTHER INSPECTIONS HAVE BEEN COMPLETED PRIOR TO SCHEDULING THIS INSPECTION. CURRENTLY 13 HOMES ARE UNDER VARIOUS STAGES OF CONSTRUCTION AN DO NOT HAVE THE SIDEWALKS AND DRIVEWAYS CONSTRUCTED AT THIS TIME. THE BASI HAS BEEN CONSTRUCTED AND WILL NEED TO HAVE ALL SEDIMENT AND TRASH REMOVED PRIOR TO THE FINAL APPROVAL.
05/12/2020 ASSURANCE - DSD Partial Approval 90% of the homes have been started, roughly 30% I’ve been finished. No sidewalks installed on unfinished homes. Common areas PO to be mostly complete. Check with Dave for final release
02/11/2020 ASSURANCE - DSD Partial Approval There is one completed home that appears to be the model at this time. There is another home that is close to finish. There are seven additional lots currently under construction and seven lots with no activity at this time. The basin and entry gate and common area sidewalks have been installed.