Plan: S17-076
Plan Details
Apply Date:
12/08/2017
Applicant:
Ryan
Description:
Saguaro Trails - Block 1,1-165
Architects:
- CEC
- Sonoran Development Consulting
Contractors:
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/04/2023 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | Canceled | Full and Final Release: Lots 1-166, CA A-E | |
07/27/2023 | COT - ENGR - Site - Assurance Release | Not Ready | Denied, Full and Final Release: Lots 1-166, CA A-E, the contractor needs to replace or repair all damaged sidewalk noted throughout this site. I drove the outer roadways and the 2 norther streets and have noted at least four areas where the sidewalks have been broken. I will be asking T.D.O.T. to performa Final Inspection for this site and all work within the Rights-of-way and note any damaged side walk, curbs, driveways. I will schedule another Inspection for this site next week. |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/09/2023 | SPECIAL INSPECTION - Pima County Sewer (Third Party) | Passed | ||
06/09/2023 | COT - WATR - Design Plan Construction | Passed |
Plan Reviews
Plan Number - S17-076
Plan Status: Approved
Plan Description: Saguaro Trails - Block 1,1-165
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/15/2018 | RESUBMITTAL - FINAL PLAT - CONDO CONVERSION | 04/17/2018 | COMPLETED |
04/17/2018 | RESUBMITTAL - FINAL PLAT - CONDO CONVERSION | 06/14/2018 | COMPLETED |
06/14/2018 | FINAL PLAT - PACKAGE | 06/29/2018 | COMPLETED |
06/28/2018 | FINAL PLAT - PACKAGE | 09/10/2018 | COMPLETED |
12/08/2017 | SUBPLAT- OK TO SUBMIT | 12/08/2017 | COMPLETED |
12/08/2017 | FINAL PLAT - REVIEW | 01/24/2018 | COMPLETED |