Plan: S17-027
Plan Details
Apply Date:
06/08/2017
Applicant:
Ronda
Description:
STARR PASS VISTAS VILLAGE 1
Architects:
- City of Tucson DTM Streets and Traffic Maintenance
- JAMES.KNIPE
- NICOLE.CANTALICIO
- Rick Engineering Company, Inc.
- Title Security Agency, LLC, a Delaware limited liability com. trust 202065-S as trustee, Ronda Tatro
Contractors:
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2017 | SPECIAL INSPECTION - Pima County Sewer (Third Party) | Passed | {Activity date: 09/27/2017; Status: Approved; Inspector: pyg; Comment: Entered by PGEHLEN1 - see letter in SIRE} | |
| 04/16/2018 | COT - WATR - Design Plan Construction | Passed | {Activity date: 04/16/2018; Status: Approved; Inspector: kl; Comment: Entered by KLEE1 - WATER APPROVAL IN SIRE} | |
| 06/03/2020 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 06/03/2020; Status: Approved; Inspector: RLEIGH; Comment: Entered by RLEIGH1 - } | |
| 06/04/2020 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 06/04/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved. All remaining lights are currently under construction and only one is missing sidewalks. Contractor is installing perimeter gates. } ; {Activity date: 05/11/2020; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to release lots 6,7} ; {Activity date: 11/25/2019; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - ok to release lots 1-5 and 11-15} ; {Activity date: 08/14/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - THE DEVELOPER HAS INSTALLED THE MISSIN DRAINAGE FEATURES FOR THE. REAR DRAINING LOTS, BUT THE SITE HAS SOME MINOR DRAINAGE DAMAGE FROM THE PAST RAINS. TO LOOK AT A FULL RELEASE OF THE SITE WE WILL NED TO HAVE ALL INSPECTION APPROVED, SIDEWALKS CONSTRUCTED FOR EVERY LOT. LANDSCAPING COMPLETED PER THE APPROVED PLANS, CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, AND REVISED/APPROVED PLANS. SHOWING ALL CHANGES/MODIFICATIONS, GNERAL SITE CLANUP, AS WELL AS I FINAL INSPECTION OF THE COMPLETED SITE. IF THERE ARE ANY QUESTIONS ABOUT THIS INSPECTION FEEL FREE TO CONTACT ME, DAVID ROBERTS AT (520) 349-7643.} ; {Activity date: 03/25/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - 1) REMOVE ALL STORMWATER CONTROLS (WADDLE NETTING) AND ENSURE THAT PERMANENT CONTROLS ARE PLACED CORRECTLY TO PREVENT CONSTRUCTION MATERIALS FROM ENTERNING INTO THE BASIN AREA. MAINTENANCE OF THESE CONTROLS WILL BE THE RESPONSIBILITY OF THE DEVELOPER/CONTRACTOR/OWNER OF THE SWPPP FOR THIS SITE TILL THE NOTICE OF TERMINATION HAS BEEN CLOSED AND PROVIDED TO THIS DEPARTMENT. 2) INSTALL THE CONTROLS AT THE DRAINAGE OPENNINGS AS SHOWN ON THE APPROVED PLANS DP17-0117} ; {Activity date: 02/11/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE COMMON AREAS OF THIS SITE CANNOT BE RELEASED AT THIS TIME. CONTACT JOHN VAN WINKLE FOR THE ISSUES THAT WILL NEED TO BE ADDRESSED FOR THIS RELEASE} ; {Activity date: 02/11/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR THE INITIAL RELEASE OF THE LOTS ON THIS SITE} |
Plan Reviews
Plan Number - S17-027
Plan Status: Approved
Plan Description: STARR PASS VISTAS VILLAGE 1
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/07/2020 | ASSURANCES | 06/09/2020 | COMPLETED |
| 06/08/2017 | SUBPLAT- OK TO SUBMIT | 06/08/2017 | COMPLETED |
| 06/08/2017 | FINAL PLAT - REVIEW | 07/14/2017 | COMPLETED |
| 07/14/2017 | FINAL PLAT - REVIEW | 09/14/2017 | COMPLETED |
| 09/14/2017 | FINAL PLAT - PACKAGE | 09/26/2017 | COMPLETED |