Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Plan Details

Status:
Approved
Type:
Land Division
Apply Date:
12/08/2016
Applicant:
Lisa
Description:
PARK MODERN LOTS 38-91
Architects:
  • Sonoran Development Consulting
Contractors:

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
Date Description Inspector Results Comments
12/06/2017 COT - WATR - Design Plan Construction Passed {Activity date: 12/06/2017; Status: Approved; Inspector: HDRUMM; Comment: Entered by AHINES2 - Water approval letter in SIRE.}
12/08/2017 SPECIAL INSPECTION - Pima County Sewer (Third Party) Passed {Activity date: 12/08/2017; Status: Approved; Inspector: PMULVEY; Comment: Entered by AHINES2 - Approval Letter in Assurances Folder on PRO/SIRE.}
06/25/2019 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) Passed {Activity date: 06/25/2019; Status: Approved; Inspector: RLEIGH; Comment: Entered by RLEIGH1 - }
06/27/2019 COT - ENGR - Site - Assurance Release Passed {Activity date: 06/27/2019; Status: Approved; Inspector: JV; Comment: Entered by JVWINKL1 - Full and Final release approved} ; {Activity date: 04/29/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK TO RELEASE THE FOLLOWING LOTS AT THIS TIME: 42, 43, 51, 52, 65, 84, AND 87. ALL OTHER INSPECTIONS ARE STILL NEEDED FOR THIS SITE.} ; {Activity date: 04/29/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are four undeveloped lot at this time and several under construction. There is a section of sidewalk missing along Blacklidge} ; {Activity date: 03/22/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - AOK TO RELEASE LOTS #39, AND #89.} ; {Activity date: 02/22/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK TO RELEASE LOT #89 AT THIS TIME} ; {Activity date: 02/08/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE SITE HAS BEEN INSPECTED FOR THE RELEASE OF LOTS #46 AND #47 AT THIS TIME} ; {Activity date: 01/25/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK TOOLOT # 64 AT THIS TIME} ; {Activity date: 12/05/2018; Status: Partial Approval; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - lots 49,50,63,88 are serveved by common-element imrpovements} ; {Activity date: 10/26/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Inspection of lot 48 only; Building is under construction and no concrete or other accessible routes have been installed anywhere around this building at this time. No houses built in this subdivision are not compliant with General note number 14 as the garage has been used for access rather than the front door as specified} ; {Activity date: 05/02/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OKAY FOR THE RELEASE OF LOTS #75, #09, #91} ; {Activity date: 01/31/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR THE INITIAL RELEASE}

Plan Reviews

Plan Number - S16-089
Plan Status: Approved
Plan Description: PARK MODERN LOTS 38-91
Start Date Submittal Complete Date Status  
03/20/2017 RESUBMITTAL - FINAL PLAT - CONDO CONVERSION 04/14/2017 COMPLETED Review Details
04/14/2017 FINAL PLAT - PACKAGE 04/21/2017 COMPLETED Review Details
12/08/2016 SUBPLAT- OK TO SUBMIT 12/08/2016 COMPLETED Review Details
12/09/2016 FINAL PLAT - REVIEW 03/20/2017 COMPLETED Review Details

Documents

File Name Document Type  
ASSURANCE LOG.XLS ASSURANCES VIEW
ASSURANCE AGREEMENT.PDF ASSURANCES VIEW
WATER APPROVAL LETTER.PDF ASSURANCES VIEW
WASTEWATER APPROVAL LETTER.PDF ASSURANCES VIEW
PARTIAL RELEASE 01.25.18.PDF ASSURANCES VIEW
PARTIAL RELEASE 04.06.18.PDF ASSURANCES VIEW
PARTIAL RELEASE 05.07.18.PDF ASSURANCES VIEW
PARTIAL RELEASE 05.24.18.PDF ASSURANCES VIEW
PARTIAL RELEASE 07.19.18.PDF ASSURANCES VIEW
PARTIAL RELEASE 08.01.18.PDF ASSURANCES VIEW
S16-089 PARTIAL RELEASE 09.05.18.PDF ASSURANCES VIEW
S16-089 PARTIAL RELEASE 09.21.18.PDF ASSURANCES VIEW
S16-089 PARTIAL RELEASE 11.20.18.PDF ASSURANCES VIEW
S16-089 PARTIAL RELEASE 12.04.18.PDF ASSURANCES VIEW
S16-089 PARTIAL RELEASE 01.29.19.PDF ASSURANCES VIEW
S16-089 PARTIAL RELEASE 02.14.19.PDF ASSURANCES VIEW
S16-089 PARTIAL RELEASE 03.04.19.PDF ASSURANCES VIEW
S16-089 PARTIAL RELEASE 03.26.19.PDF ASSURANCES VIEW
S16-089 PARTIAL RELEASE 03262019.PDF ASSURANCES VIEW
S16-089 PARTIAL RELEASE 05.03.19.PDF ASSURANCES VIEW
S16-089 PARTIAL RELEASE, 05.30.19.PDF ASSURANCES VIEW
S16-089 FULL RELEASE, 06.27.19.PDF ASSURANCES VIEW
FINAL_001.TIF PLATS VIEW
FINAL_002.TIF PLATS VIEW
FINAL_003.TIF PLATS VIEW
None DOCUMENTS VIEW