Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Details

Status:
Final
Type:
SUBDPLAT
Apply Date:
03/12/2014
Applicant:
PULTE HOMES
Description:
SUBC
Contractors:
  • PULTE HOMES

Outstanding Plan Activity Conditions

Plan Number - S14-008
Plan Description: SUBC
Date Name Approved Comments
03/12/2014 RECEIVED LETTER OF CERTIFICATION Not Approved

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 5
Date Description Inspector Results Comments
11/25/2015 ASSURANCE - DSD DROBERTS Approved THIS SITE HAS BEEN INSPECTED FOR THE POSSIBLE FULL RELEASE OF ASSURANCES, CURRENTLY THIS IS NOT POSSIBLE AT THIS TIME DUE TO THE REMAINING INCOMPLETE WORK WITHIN THE COMMON AREAS OF THE SITE. ALL INSPECTIONS FOR THIS SITE WILL NEED TO BE APPROVED. APPROVAL LETTERS FROM PIMA COUNTY WASTE WATER AND THE TUCSON WATER DEPARTMENT NEED TO BE SUBMITTED PRIOR TO ANY CONSIDERATION FOR A FULL RELEASE. THE LANDSCAPE MATERIALS FOR THIS SITE IS BEING INSTALLED AT THIS TIME, AND MOST OF IT APPEARS TO HAVE BEEN PLACED PER THE APPROVED PLANS. ENSURE THAT ALL OF THE LANDSCAPE ITEMS HAVE BEEN PLACED PRIOR TO MAKING A FINAL REQUEST FOR THE FULL RELEASE OF THE ASSURANCES.
THE FOLLOWING LOTS HAVE NOT BEEN RELEASED AT THIS TIME AND WILL NEED TO HAVE ASSURANCE INSPECTIONS TIED TO THEIR INSPECTIONS FOR THE PERMIT CARDS:
07/28/2016 ASSURANCE - DOT TRAFFIC PB Approved Approval letter has been uploaded to SIRE.
07/28/2016 ASSURANCE - DOT PERMITS & CODE PB Approved Approval letter has been uploaded to SIRE
06/27/2017 ASSURANCE - PC WASTEWATER PYG Approved Two letters in SIRE
06/27/2017 ASSURANCE - UTILITY SERVICES PYG Approved Letter in SIRE

Plan Reviews

Plan Number - S14-008
Plan Status: Final
Plan Description: SUBC
Start Date Submittal Complete Date Status  
03/12/2014 FINAL PLAT - REVIEW 03/12/2014 COMPLETED Review Details
03/12/2014 FINAL PLAT - REVIEW 04/09/2014 COMPLETED Review Details
07/01/2014 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 07/18/2014 COMPLETED Review Details
07/18/2014 FINAL PLAT - PACKAGE 07/22/2014 COMPLETED Review Details