Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: S13-026
Plan Details
Apply Date:
08/27/2013
Applicant:
Unknown
Description:
VALENCIA CROSSING LT 1-4 BLK A
Architects:
- City of Tucson DTM Streets and Traffic Maintenance
- LENNAR ARIZONA CONSTRUCTION INC
- Rick Engineering Company, Inc.
- Terramar Development
- Terramar Properties
- Title Security Agency, LLC, a Delaware limited liability com. trust 202065-S as trustee, Ronda Tatro
Contractors:
Outstanding Plan Activity Conditions
Plan Number - S13-026
Plan Description: VALENCIA CROSSING LT 1-4 BLK A
Date | Name | Approved | Comments |
---|---|---|---|
08/27/2013 | RECEIVED LETTER OF CERTIFICATION | Not Approved |
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/17/2021 | COT - ENGR - Site - Assurance Release | Partial Pass | {Activity date: 12/17/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - OK TO RELEASE BLOCK “A” } ; {Activity date: 09/30/2021; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE FULL RELEASE OF THIS SUBDIVISION WILL NOT BE CONSIDERED AT THIS TIME. CURRENTLY THERE ARE 3 ISSUES PREVENTING THE FULL RELEASE OF THE SITE: 1) THE WESTERN DRAINAGE WAY HAS AREAS THAT HAVE BEEN DAMAGED/ERODED FROM THE I-10 DRAINAGE RUN OFF ONTO THE WESTERN SIDE OF THE DRAINAGE WAY AT THE NORTH END. THESE WILL NEED TO BE REPAIRED PRIOR TO THE ACCEPTANCE OF THIS SITE FOR A FINAL CLOSURE. 2) THE SPINE ROAD THROUGH THIS SITE HAS ONLY BEEN COMPLETED 50% OF THE WAY THROUGHOUT THIS SITE AND WILL NEED TO BE COMPLETED FULLY AS NOTED IN NOTE #9 OF EXHIBIT "B". "REQUIRED OFF-SITE AND ON-SITE IMPROVEMENTS AS SHOWN ON THE APPROVED TENTATIVE PLAT, IMPROVEMENT PLANS, AND GRADING PLANS." 3) LOTS 3 AND 4 CAN BE RELEASED AT THIS TIME BECAUSE THEY HAVE BEEN PLACED INTO THEIR OWN SUBDIVISION S18-053. I HAVE DISCUSSED THE INCOMPLETE SPINE ROAD ITEM AT LENGTH WITH STEPHEN BLOOD, WHO HAS CONSULTED WITH MEMBERS OF THE TRANSPORTATION AND PLANNING AND DEVELOPMENT SERVICES DEPARTMENT. THE INTENT OF ONLY A PORTION (50 FEET) OF THE 100 FOOT WIDE ROADWAY WAS GRANTED SO THAT THE WORK COULD BE STARTED WITHOUT DELAYING THE DEVELOPER. FROM WHAT I HAVE BEEN TOLD IT WAS NOT TO BE CONSIDERED TO BE COMPLETED TILL THE REMAINING PORTION OF THE ROADWAY WAS DONE. IT WOULD NOT BE ALLOWED TO BE DELAYED INEVITABLY OR CONSIDERED COLMPLETED AT THIS TIME, UNLESS THERE IS A LETTER/AGREEMENT/DOCUMENT WITH ALL THE DEPARTMENTS MAKING THAT STATEMENT.} ; {Activity date: 09/03/2021; Status: Denied; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - DENIED, COMPLETE ALL OTHER INSPECTIONS FOR THIS PERMIT PRIOR TO SCHEDULING THIS INSPECTION AGAIN} |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/02/2021 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 09/02/2021; Status: Approved; Inspector: Sharon; Comment: Entered by SBEASLE1 - Approved - See in Documents section of PRO: "S13-026, Dept. of Transp, Infrastructure Acceptance, 08.08.21".} | |
10/14/2021 | SPECIAL INSPECTION - Pima County Sewer (Third Party) | Passed | {Activity date: 10/14/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH PCWW, THEY HAVE NO CONCERNS FOR THIS FINAL PLAT, ALL SEWER WILL BE ADDRESSED ON FUTURE TENTATIVE PLATS.} | |
10/21/2021 | COT - WATR - Design Plan Construction | Passed | {Activity date: 10/21/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/21/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - APPROVED ON THIS DATE DUE TO THE LETTERS PROVIDED TO THIS DEPARTMENT FROM DONALD POMROY FOR PHASE I AND 2} ; {Activity date: 08/24/2021; Status: Partial Approval; Inspector: Sharon; Comment: Entered by SBEASLE1 - Tucson Water PHASE TWO approval. See document in PRO: "Final Approval, Tucson Water, Phase two, March 2021".} ; {Activity date: 08/18/2021; Status: Partial Approval; Inspector: SharonBeasle; Comment: Entered by SBEASLE1 - Tucson Water PHASE THREE approval. See document in PRO: "Final Approval, Tucson Water, Phase three, March 2021".} ; {Activity date: 08/18/2021; Status: Partial Approval; Inspector: SharonBeasle; Comment: Entered by SBEASLE1 - Tucson Water PHASE ONE approval. See document in PRO: "Final Approval, Tucson Water, Phase one, March 2021".} |
Plan Reviews
Plan Number - S13-026
Plan Status: Approved
Plan Description: VALENCIA CROSSING LT 1-4 BLK A
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/26/2018 | RESUBMITTAL - MINOR SUBD REVIEW | 04/03/2018 | COMPLETED |
04/03/2018 | FINAL PLAT - PACKAGE | 04/16/2018 | COMPLETED |
04/04/2014 | RESUBMITTAL - MINOR SUBD REVIEW | 03/26/2018 | COMPLETED |
08/27/2013 | MINOR SUBDIVISION REVIEW | 09/27/2013 | COMPLETED |
09/16/2013 | RESUBMITTAL - MINOR SUBD REVIEW | 04/04/2014 | COMPLETED |