Inspection Status: Passed
Inspection History: COT - WATR - Design Plan Construction
| Date |
Description |
Inspector |
Results |
Comments |
| 10/21/2021 |
COT - WATR - Design Plan Construction |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 10/21/2021 |
COT - WATR - Design Plan Construction |
DROBERTS |
Approved |
Entered by DROBERT5 - APPROVED ON THIS DATE DUE TO THE LETTERS PROVIDED TO THIS DEPARTMENT FROM DONALD POMROY FOR PHASE I AND 2 |
| 08/24/2021 |
COT - WATR - Design Plan Construction |
Sharon |
Partial Approval |
Entered by SBEASLE1 - Tucson Water PHASE TWO approval. See document in PRO: "Final Approval, Tucson Water, Phase two, March 2021". |
| 08/18/2021 |
COT - WATR - Design Plan Construction |
SharonBeasle |
Partial Approval |
Entered by SBEASLE1 - Tucson Water PHASE THREE approval. See document in PRO: "Final Approval, Tucson Water, Phase three, March 2021". |
| 08/18/2021 |
COT - WATR - Design Plan Construction |
SharonBeasle |
Partial Approval |
Entered by SBEASLE1 - Tucson Water PHASE ONE approval. See document in PRO: "Final Approval, Tucson Water, Phase one, March 2021". |