Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: S05-098
Plan Details
Apply Date:
06/17/2005
Applicant:
Shawn
Description:
LA ESTANCIA DE TUCSON 1- 340
Architects:
- City of Tucson DTM Streets and Traffic Maintenance
- Richmond American Homes of AZ, Inc.
- THE CONTINENTAL INSURANCE COMPANY
Contractors:
Scheduled Inspections
Plan Number - S05-098
Plan Status: Approved
Plan Description: LA ESTANCIA DE TUCSON 1- 340
Total Scheduled Inspections - 1
Scheduled Date | Description | Inspector | Status |
---|---|---|---|
11/29/2024 | COT - ENGR - Site - Assurance Release | Scheduled |
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/30/2022 | SPECIAL INSPECTION - Pima County Sewer (Third Party) | Partial Pass | {Activity date: 08/30/2022; Status: Partial Approval; Inspector: sharon; Comment: Entered by SBEASLE1 - Request for copy of final approval for wastewater was emailed to Rachel Turnipseed, Fidelity Ntl Title, today.} ; {Activity date: 02/05/2018; Status: Partial Approval; Inspector: KL; Comment: Entered by KLEE1 - Wastewater approval for Lots 117-150, 217-243, 710-735, 780-791} ; {Activity date: 10/04/2017; Status: Partial Approval; Inspector: pyg; Comment: Entered by PGEHLEN1 - lots 287 = permit number T17CM03270 lots 290 = permit number T17CM01795} ; {Activity date: 07/13/2017; Status: Partial Approval; Inspector: pyg; Comment: Entered by PGEHLEN1 - lots 151-216 and 244-286 and 291-293} ; {Activity date: 01/04/2017; Status: Partial Approval; Inspector: PB; Comment: Entered by PBAUGHM1 - Wastewater Approval for lots 250-256, 263, 265-269 & 270- 272 entered into Sire.} ; {Activity date: 10/18/2010; Status: Partial Approval; Inspector: RMONTOYA; Comment: Entered by KMEDINA1 - G-2010-003 331 357 398 APPROVED SEE SIRE} ; {Activity date: 03/13/2009; Status: Denied; Inspector: RMONTOYA; Comment: Entered by KMEDINA1 - G-2006-017 SEE SIRE DENIAL FOR LOTS 38, 122, 142, 323, 324, 380, 503, 504, 523, & 661. G-2008-002 SEE SIRE DENIAL FOR LOTS 39-49, 52, 7, 53} |
|
08/23/2024 | COT - ENGR - Site - Assurance Release | Not Ready | Still waiting for the landscape plan approval |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/01/2017 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 05/01/2017; Status: Approved; Inspector: KL; Comment: Entered by KLEE1 - Per Letter in SIRE from TDOT} | |
02/05/2019 | COT - WATR - Design Plan Construction | Passed | {Activity date: 02/05/2019; Status: Approved; Inspector: AH; Comment: Entered by AHINES2 - SEE WATER APPROVAL EMAIL FROM BETH MOORE FROM 082318} ; {Activity date: 11/21/2018; Status: Partial Approval; Inspector: KL; Comment: Entered by KLEE1 - Water Approval for lots 444-458} ; {Activity date: 08/24/2018; Status: Approved; Inspector: KL; Comment: Entered by KLEE1 - Lots 33-38, 117-146 and 218-243, 294-330. See email from Tucson Water in SIRE.} ; {Activity date: 02/02/2018; Status: Partial Approval; Inspector: KL; Comment: Entered by KLEE1 - Phase 7- 117-146, 218-243 and 294-330. Letter uploaded to SIRE} ; {Activity date: 11/15/2016; Status: Partial Approval; Inspector: PB; Comment: Entered by PBAUGHM1 - Water Approval for Lots 244-272 and 287-293. Letter uploaded to SIRE.} ; {Activity date: 07/06/2016; Status: Partial Approval; Inspector: PB; Comment: Entered by PBAUGHM1 - Water approval for lots 147 to 217 and 273 to 286 in SIRE.} |
Plan Reviews
Plan Number - S05-098
Plan Status: Approved
Plan Description: LA ESTANCIA DE TUCSON 1- 340
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/13/2006 | FINAL PLAT REVIEW | 05/11/2006 | COMPLETED |
04/18/2006 | ASSURANCES | 05/16/2006 | COMPLETED |
06/16/2006 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 07/26/2006 | COMPLETED |
06/17/2005 | TENTATIVE PLAT REVIEW | 07/13/2005 | COMPLETED |
06/19/2006 | ASSURANCES | 07/03/2006 | COMPLETED |
06/23/2006 | REVISION - TENTATIVE PLAT REVIEW | 08/17/2006 | COMPLETED |
07/12/2006 | ASSURANCES | 07/26/2006 | COMPLETED |
07/15/2005 | TENTATIVE PLAT REVIEW | 09/06/2005 | COMPLETED |
08/16/2006 | ASSURANCES | 08/24/2006 | COMPLETED |
09/14/2006 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 09/29/2006 | COMPLETED |
09/27/2006 | ASSURANCES | 10/04/2006 | COMPLETED |
10/06/2006 | FINAL PLAT PACKAGE | 10/18/2006 | COMPLETED |
10/06/2020 | ASSURANCES | 02/09/2021 | COMPLETED |
10/13/2005 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 11/23/2005 | COMPLETED |
12/13/2005 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 01/25/2006 | COMPLETED |