Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Details

Status:
Approved
Type:
Land Division
Apply Date:
08/31/2004
Applicant:
Ronda
Description:
SAVAGE ADDITION AMENDED
Architects:
  • City of Tucson DTM Streets and Traffic Maintenance
  • FIDELITY NATIONAL TITLE AGENCY
  • IGO & ROSEWOOD LLC
  • OT BUILDERS LLC
  • Title Security Agency, LLC, a Delaware limited liability com. trust 202065-S as trustee, Ronda Tatro
Contractors:

Outstanding Inspections

Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/11/2013 COT - ENGR - Site - Assurance Release Re-inspection required {Activity date: 04/11/2013; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS NOT READY FOR A FULL RELEASE AT THIS TIME. I HAVE CONTACTED ZACH HINMAN AND ADVISED HIM THAT MOST OF THE ITEMS FOR LINE AND GRADE APPEAR TO BE AS SHOWN ON THE APPROVED PLANS. HE WILL NEED TO ADVISE ME OF WHAT IS TO HAPPEN WITH THE REMAINING LOT OPEN ON THIS SITE AND ADDRESS THE LANDSCAPING ITEMS THAT HAVE NOT BEEN INSTALLED AS SHOWN ON THE APPROVED PLANS. HE WILL ADDRESS THESE AREAS WITH HIS PERSONNEL AND LET ME KNOW WHAT IS HAPPENING. ALSO THIS SITE STILL NEEDS FULL APPROVAL FROM THE TRANSPORTATION AND TRAFFIC DEPARTMENTS AT THIS TIME, I WILL ASK THAT THESE INSPECTIONS BE PERFORMED ASAP.} ; {Activity date: 07/11/2011; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CHANGE IN THE SITE SINCE THE DEVELOPER HAS RESLOPED THE WESTERN LOTS. CREWS ARE CURRENTLY WORKING ON THE PLACEMENT OF FORMS AND TRENCHING FOR THE PLUMBING AT THE SOUTHWEST CORNER OF THE SITE, LOT #10.} ; {Activity date: 03/29/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE CONTRACTOR TO DISCUSS THE WALL INSTALLATION FOR THIS SITE. REMINDED THEM THAT SINCE THE WALL IS A RETAINING WALL THEY WILL NEED TO OBTAIN A PERMIT PRIOR TO STARTING THE WORK. ZACH WILL PICK UP THE PERMIT BEFORE ANY WORK IS DONE, THEY WILL EXCAVATE TO THE FOOTER DEPTHS TILL THE PERMIT IS PICKED UP. THIS CREW WILL PLACE STORMWATER CONTROLS AT THE EXISTING STRUCTURE TO PREVENT ANY MATERIAL FROM ENTERING INTO THE PIPES.} ; {Activity date: 03/27/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - TALKED TO ZACH HINMAN 520-750-7282 TO DISCUSS HAVING AN ON SITE MEETING WITH THE CONTRACTOR THAT WILL BE CONSTRUCTING THE WALLS FOR THE DRAINAGE INLET STRUCTURE AT THE SOUTHEAST CORNER OF THIS SITE. WE WILL MEET ONSITE AT 9:00 IN THE MORNING ON 3/29/2012 TO DISCUSS WHAT THEY ARE PLANNING ON DOING.} ; {Activity date: 03/14/2011; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LOOKED AT THE SITE TO VERIFY THAT ALL OF THE WORK HAS BEEN DONE FOR THE INITIAL RELEASE FOR THE SITE. THIS SITE HAS COMPLETED ENOUGH OF THE WORK FOR THE RELEASES, ADDITIONAL WORK WILL BE COMPLETED PRIOR TO THE FINAL RELEASE OF THIS SITE. CURRENTLY THERE IS AN ISSUE WITH THE CITY OF TUCSON STREETS DEPARTMENT AND ENVIRONMENTAL SERVICES DEPARTMENT IN REGARDS TO THE SOUTHEAST CORNER OF THE SITE AND A DRAINAGE INLET STRUCTURE. THEY HAVE CONCERNS ABOUOT THE CLOSE PROXIMITY OF THIS TO THE ADJACENT ALLEY AND THE LACK OF GUARDRAIL TO PROTECT THEIR SERVICE VEHICLES.} ; {Activity date: 01/04/2011; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT2 - LOOKED AT THE SITE TO SEE IF THE MANHOLES HAD BEEN COMPLETED AS I WAS ADVISED BY THE DEVELOPER / MESQUITE / ZACH HINMAN (1-480-221-2083). THE MANHOLES HAVE BEEN RAISED, AND THE SURVEY MONUMENTS HAVE BEEN POURED, BUT THEY HAVE NOT BEEN DONE CORRECTLY. THIS SITE WILL BE ACCEPTABLE FOR THE INITIAL RELEASE ONCE WE HAVE RECEIVED THE HOLD HARMLESS LETTER FROM PIMA COUTY DEPARTMENT OF ENVIRONMENTAL QUALITY OF AN ACCEPTANCE LETTER FROM PIMA COUNTY WAST WATER. ONCE THIS HAS BEEN RECEIVED BY THIS DEPARTMENT THE INSPECTION ACTION WILL BE CHANGE TO A PARTIAL AND RELEASE LETTERS FOR LOTS CAN BEGIN.} ; {Activity date: 05/12/2010; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT2 - MET ON-STIE WITH DAVID OLANIK 548-1950 AND DISCUSSED WHAT IS STILL NEEDED FOR THE INITIAL RELEAS OF THE SITE. HE WILL WORK ON THE FOLLOWING ITEMS PRIOR TO CALLING IN FOR THE INITIAL RELEASE OF THE SITE:
1) RAISE ALL OF THE MANHOLES TO FINISH GRADE AND REPAIR ALL PAVEMENT AS NEEDED.
2) ESTABLISH THROUGH THE TRANSPORTATION DEPARTMENT / JOSE RODRIGUEZ WHAT WILL BE NEEDED TO BE DONE AT THE DRAINAGE STRUCTURE LOCATED AT THE SOUTHEAST CORNER OF THE SITE TO MAKE IF SAFE AND ACCEPTABLE.

THE ONLY OTHER CONCERN AT THIS TIME ON THE SITE IS HOW THE DRAINAGE HAS BEEN WORKING IN THE PAST AND THE TIME THAT IT TAKES THE SITE TO DISCHARGE THE WATER FULLY.}
05/15/2013 TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) Partial Pass {Activity date: 05/15/2013; Status: Partial Approval; Inspector: MGEWEKE; Comment: Entered by KMEDINA1 - SEE SIRE}

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 2
Date Description Inspector Results Comments
03/22/2007 COT - WATR - Design Plan Construction Passed {Activity date: 03/22/2007; Status: Approved; Inspector: LHERNAND; Comment: Entered by ASHOFFS1 - }
02/15/2011 SPECIAL INSPECTION - Pima County Sewer (Third Party) Passed {Activity date: 02/15/2011; Status: Approved; Inspector: RMONTOYA; Comment: Entered by KMEDINA1 - SEE SIRE}

Plan Reviews

Plan Number - S04-119
Plan Status: Approved
Plan Description: SAVAGE ADDITION AMENDED
Start Date Submittal Complete Date Status  
06/15/2005 FINAL PLAT REVIEW 07/28/2005 COMPLETED Review Details
09/01/2004 TENTATIVE PLAT REVIEW 10/01/2004 COMPLETED Review Details
09/22/2005 RESUBMITTAL - CDRC - FINAL PLAT REVIEW 10/21/2005 COMPLETED Review Details
09/23/2005 ASSURANCES 10/31/2005 COMPLETED Review Details
10/31/2005 FINAL PLAT PACKAGE 09/08/2006 COMPLETED Review Details
11/12/2004 RESUBMITTAL - TENTATIVE PLAT REVIEW 12/13/2004 COMPLETED Review Details
12/17/2004 RESUBMITTAL - TENTATIVE PLAT REVIEW 12/23/2004 COMPLETED Review Details

Documents

File Name Document Type  
ASSURANCE AND RELEASE LOG.XLS ASSURANCES VIEW
ASSURANCE COMMENT SHEET.XLS ASSURANCES VIEW
ORIGINAL AGREEMENT 20252.TIF ASSURANCES VIEW
RELEASE LETTER 2013_04_05.PDF ASSURANCES VIEW
RELEASE LETTER 2012_12_19.PDF ASSURANCES VIEW
RELEASE LETTER 2012_10_17.PDF ASSURANCES VIEW
RELEASE LETTER 2012_07_25.PDF ASSURANCES VIEW
RELEASE LETTER 2012_06_27.PDF ASSURANCES VIEW
RELEASE LETTER 2012_05_22.PDF ASSURANCES VIEW
RELEASE LETTER 2012_02_23.PDF ASSURANCES VIEW
RELEASE LETTER 2012_01_18.PDF ASSURANCES VIEW
RELEASE LETTER 2011_10_26.PDF ASSURANCES VIEW
RELEASE LETTER 2011_04_13.PDF ASSURANCES VIEW
RELEASE LETTERS 2006.PDF ASSURANCES VIEW
SUBSTITUTE AGREEMENT 2010_09_10.PDF ASSURANCES VIEW
SUBSTITUTE AGREEMENT 2007_01_15.TIF ASSURANCES VIEW
SUBSTITUTE AGREEMENT 2006_11_09.TIF ASSURANCES VIEW
SUBSTITUTE AGREEMENT 2006_03_03TIF ASSURANCES VIEW
WASTEWATER APPROVAL 2011_02_15.PDF ASSURANCES VIEW
PERMITS AND CODES APPROVAL LETTER 2013_04_15.PDF ASSURANCES VIEW
TRAFFIC ENGINEERING CONDITIONAL APPROVAL.DOC ASSURANCES VIEW
CERTIFICATION LETTER 2013_09_27.PDF ASSURANCES VIEW
FINAL_01.TIFF PLATS VIEW
FINAL_02.TIFF PLATS VIEW
MP-60-064_001.TIF PLATS VIEW
MP-60-064_002.TIF PLATS VIEW
MP-60-064_003.TIF PLATS VIEW
MP-60-064_004.TIF PLATS VIEW
MP-60-064_005.TIF PLATS VIEW
MP-60-064_006.TIF PLATS VIEW
MP-60-064_007.TIF PLATS VIEW
MP-60-064_008.TIF PLATS VIEW
MP-60-064_009.TIF PLATS VIEW
MP-60-064_010.TIF PLATS VIEW
TENTATIVE_01.TIF PLATS VIEW
TENTATIVE_02.TIF PLATS VIEW
LANDSCAPE_01.TIF PLATS VIEW
LANDSCAPE_04.TIF PLATS VIEW
LANDSCAPE_05.TIF PLATS VIEW
NPP_LANDSCAPE_02.TIF PLATS VIEW
NPP_LANDSCAPE_03.TIF PLATS VIEW
ZONING_REVIEW.XLS PLATS VIEW
ZONING_REVIEW.TIF PLATS VIEW