Inspection Status: Passed
Inspection History: TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance)
| Date |
Description |
Inspector |
Results |
Comments |
| 04/16/2013 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
DROBERTS |
Approved |
Entered by DROBERT5 - THIS SITE HAS BEEN APPROVED BY THE CITY OF TUCSON PERMITS AND CODES SECTION WITH THE ATTACHED LETTER IN SIRE DATED APRIL 15, 2013. AT THIS TIME LOT NUMBER 9 HAS NOT BEEN CONSTRUCTED UPON, THIS LOTS INGRESS IS OFF OF IGO WAY AND WILL NEED TO BE CONSTRUCTED AT A LATER DATE. THE ASSURANCES FOR THIS SITE WILL NOT BE RELEASED UNTIL ALL OPEN ITEMS FOR PDSD HAVE BEEN ADDRESSED AND RECTIFIED FOR A COMPLETE CLOSURE. |
| 04/15/2013 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
BESPINO |
Approved |
Entered by KMEDINA1 - SEE SIRE |
| 05/15/2013 |
TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) |
MGEWEKE |
Partial Approval |
Entered by KMEDINA1 - SEE SIRE |