Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance)
Plan Number - S04-119
Inspection Description - TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance)
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/16/2013 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | DROBERTS | Approved | Entered by DROBERT5 - THIS SITE HAS BEEN APPROVED BY THE CITY OF TUCSON PERMITS AND CODES SECTION WITH THE ATTACHED LETTER IN SIRE DATED APRIL 15, 2013. AT THIS TIME LOT NUMBER 9 HAS NOT BEEN CONSTRUCTED UPON, THIS LOTS INGRESS IS OFF OF IGO WAY AND WILL NEED TO BE CONSTRUCTED AT A LATER DATE. THE ASSURANCES FOR THIS SITE WILL NOT BE RELEASED UNTIL ALL OPEN ITEMS FOR PDSD HAVE BEEN ADDRESSED AND RECTIFIED FOR A COMPLETE CLOSURE. |
04/15/2013 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | BESPINO | Approved | Entered by KMEDINA1 - SEE SIRE |
05/15/2013 | TRSP – PIA - Engineering Final – Completion of PIA Work (Final Lot Release/Acceptance) | MGEWEKE | Partial Approval | Entered by KMEDINA1 - SEE SIRE |