Plan: S04-108
Plan Details
Apply Date:
08/19/2004
Applicant:
BAKER AND ASSOCIATES
Description:
SUBC
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2006 | ASSURANCE - PC WASTEWATER | SRAVAL | Approved | |
| 12/14/2007 | ASSURANCE - DSD | DROBERTS | Approved | SEE THE PREVIOUS COMMENTS BELOW FROM THE INSPECTION DATED10/02/07, ALL COMPLETED ITEMS PREVIOUSLY NOTED HAVE BEEN DELETED. THE SITE WAS CHECKED FOR THE FINAL RELEASE OF THE ASSURANCES, THE FOLLOWING ITEMS HAVE BEEN FOUND TO BE INCOMPLETE AT THIS TIME: 1) ALL SIDEWALKS & DRIVEWAYS HAVE NOT BEEN INSTALLED OR CONSTRUCTED ON THIS SITE AT THIS TIME. A COMPLETION BOND WILL BE REQUIRED FOR ALL REMAINING ASSURABLE ITEMS PRIOR TO THE FINAL RELEASE, PLEASE NOTE ALL LOCATIONS AND QUANTITIES IN THE ACCOMPANING DOCUMENTATION FOR THE BOND. 2) COMPLETE ALL SLOPE GRADING AND DRAINAGE STRUCTURES ALONG THE EAST SIDE OF THIS PROJECT, AND PROVIDE AS-BUILT DRAWINGS FOR ALL CHANGES. 4) COMPLETE ALL PIA WORK ASSOCIATED WITH THIS PROJECT ON 22ND STREET. 5) REPAIR ALL DAMAGED PAVEMENT, SETTLED WATER VALVES AND SURVEY MONUMENTS, AND COMPLETE THE INSTALLATION OF ALL SURVEY MONUMENTS AS NOTED ON THE APPROVED PLANS FOR VISTA OVERLOOK DR. AND AGAVE OVERLOOK DR. 6) PROVIDE A LETTER OF CERTIFICATION FOR ALL DRAINAGE ITEMS WITHIN THE PROJECT LIMITS. THIS IS NOT TO BE CONSIDERED A FULL AND COMPLETE PUNCHLIST UNTIL THE BOND QUANTITIES HAVE BEEN SUBMITTED FOR ALL REMAINING ASSURABLE ITEMS. THE FOLLOWING UNITS ARE STILL EITHER UNDER CONSTRUCTION OR NOT DEVELOPED AT THIS TIME: 1, 2, 5-9, 139-145 |
| 08/28/2008 | ASSURANCE - DOT PERMITS & CODE | RLEIGH | Approved | PLAN NO. : I-2005-041 This office has inspected Pantano Overlook public improvements and found the project completed and in substantial conformance. The Engineering- of- Record must submit the original "As Built" Mylars showing any revisions and/ or changes to line and grade prior to acceptance by the City of Tucson for maintenance and operation. Additionally, the Private Improvement Agreement (PIA) requires the owner/ developer to pay any applicable fees for onsite roadway surface treatment (at a minimum fog coat). An offsite roadway surface treatment may be required depending on field conditions. Please submit fog coat fees of $23,491.65 . The fees shall be paid to the City of Tucson, Department of Transportation (DOT). A letter of acceptance from the Engineering Division will follow after the receipt of the Mylars and applicable surface treatment fees have been paid. Please contact Traffic Engineering for any outstanding obligations pertaining to traffic signage and striping. |
| 09/02/2008 | ASSURANCE - DOT TRAFFIC | TSTOCKET | Approved | PLAN NO. : I-2005-041 As of August 20, 2008, The Signs- Posts and Striping for the Right Turn lane (WBT) on 22nd Street into the Development have been completed and is Acceptable. "However" the following items, required per the plans (pages #2,8 & 9) within the development have not been installed. 1) Two (2) 25 MPH signs-posts (page #2, #8). 2) Ten (10) "No Parking-Fire Access" signs-posts (pages #8,#9). 3) All of the street name signs within the project have the wrong block numbers. |
| 05/11/2009 | ASSURANCE - UTILITY SERVICES | LHERNAND | Approved | EMAIL APPROVAL SEE SIRE |
Plan Reviews
Plan Number - S04-108
Plan Status: Final
Plan Description: SUBC
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/04/2005 | RESUBMITTAL - TENTATIVE PLAT REVIEW | 02/23/2005 | COMPLETED |
| 03/08/2005 | FINAL PLAT REVIEW | 04/14/2005 | COMPLETED |
| 03/09/2005 | ASSURANCES | 04/08/2005 | COMPLETED |
| 04/22/2005 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 05/06/2005 | COMPLETED |
| 06/01/2005 | ASSURANCES | 06/20/2005 | COMPLETED |
| 06/01/2005 | FINAL PLAT PACKAGE | 07/05/2005 | COMPLETED |
| 08/23/2004 | TENTATIVE PLAT REVIEW | 09/30/2004 | COMPLETED |
| 11/29/2004 | RESUBMITTAL - TENTATIVE PLAT REVIEW | 12/16/2004 | COMPLETED |