Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ASSURANCE - DOT PERMITS & CODE
Plan Number - S04-108
Inspection Description - ASSURANCE - DOT PERMITS & CODE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2009 | ASSURANCE - DOT PERMITS & CODE | Approved | SEE SIRE | |
| 08/28/2008 | ASSURANCE - DOT PERMITS & CODE | Partial Approval | PLAN NO. : I-2005-041 This office has inspected Pantano Overlook public improvements and found the project completed and in substantial conformance. The Engineering- of- Record must submit the original "As Built" Mylars showing any revisions and/ or changes to line and grade prior to acceptance by the City of Tucson for maintenance and operation. Additionally, the Private Improvement Agreement (PIA) requires the owner/ developer to pay any applicable fees for onsite roadway surface treatment (at a minimum fog coat). An offsite roadway surface treatment may be required depending on field conditions. Please submit fog coat fees of $23,491.65 . The fees shall be paid to the City of Tucson, Department of Transportation (DOT). A letter of acceptance from the Engineering Division will follow after the receipt of the Mylars and applicable surface treatment fees have been paid. Please contact Traffic Engineering for any outstanding obligations pertaining to traffic signage and striping. |