Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: S04-081
Plan Details
Apply Date:
07/07/2004
Applicant:
STANTEC
Description:
SUBC
Contractors:
- STANTEC
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2006 | ASSURANCE - PC WASTEWATER | SRAVAL | Approved | G-2004-116 |
| 08/22/2006 | ASSURANCE - DOT TRAFFIC | TSTOCKET | Approved | APPROVAL FOR I-2005-049 |
| 08/22/2006 | ASSURANCE - DOT TRAFFIC | THAUSER | Approved | APPROVAL FOR I-2005-049 |
| 11/20/2006 | ASSURANCE - DOT PERMITS & CODE | THARVISO | Approved | APPROVAL FOR I-2005-049 THIS OFFICE HAS INSPECTED SYCAMORE PARK- VILLAGE 1, 2, 4, 6 & 7 AND FOUND THE PROJECT COMPLETED AND IN SUBSTANTIAL CONFORMANCE. THE ENGINEER-OF-RECORD MUST SUBMIT THE ORIGINAL "AS BUILT" MYLARS SHOWING ANY REVISIONS AND/OR CHANGES TO LINE AND GRADE PRIOR TO ACCEPTANCE BY THE CITY OF TUCSON FOR MAINTENANCE AND OPERATION. ADDITIONALLY, THE PRIVATE IMPROVEMENT AGREEMENT (PIA) REQUIRES THE OWNER/DEVELOPER TO PAY ANY APPLICABLE FEES FOR ONSITE ROADWAY SURFACE TREATMENT (AT A MINIMUM FOG COAT). AN OFFSITE ROADWAY SURFACE TREATMENT MAY BE REQUIRED DEPENDING ON FIELD CONDITIONS. PLEASE SUBMIT FOG COAT FEES OF $60, 339.30 (VILLAGE 1: $12,897.90, VILLAGE 2: $17,460.45, VILLAGE 4: $13,382.25, VILLAGE 6: $12,060.30, AND VILLAGE 7: $4,544.40). THESE FEES SHALL BE PAID TO THE CITY OF TUCSON, DEPARMENT OF TRANSPORTATION (DOT). A LETTER OF ACCEPTANCE FROM THE ENGINEERING DIVISION WILL FOLLOW AFTER THE RECEIPT OF THE MYLARS AND APPLICABLE SURFACE TREATMENT FEES HAVE BEEN PAID. |
| 11/01/2007 | ASSURANCE - UTILITY SERVICES | KFESTA | Approved | WESTLAND RESOURCES APPROVAL OF WATER SYSTEM |
| 12/21/2007 | ASSURANCE - DSD | DROBERTS | Approved | A MEETING WAS HELD ON-SITE NICHOLE KALAHAR-ZORMEIER, NICOLE CANTALICIO, SEAN RICH AND MYSELF TO DISCUSS THE RELEASE OF THE ASSURANCES AND THE GRADING PERMIT. THEY WILL ADDRESS ALL ITEMS THAT HAVE BEEN NOTED IN PREVIOUS INSPECTIONS PRIOR TO SCHEDULING FOR OTHER INSPECTIONS. CLARIFICATIONS HAVE BEEN MADE ON WHAT WE ARE ASKING TO BE COMPLETED AT THIS TIME, BUT THE DEVELOPER DOES FEEL THAT PORTIONS OF THE ITEMS ARE PART OF DIAMOND VENTURES ORIGINAL CONTACT. I HAVE ADVISED THEM TO ADDRESS ALL ITEMS ON THE PREVIOUS PUNCHLIST, AND IF THEY FEEL THAT SOMETHING BELONGS TO SOMEONE ELSE REFERENCE THAT IN THEIR LETTER. ALSO WE WILL NEED AS-BUILT DRAWINGS FOR ALL ITEMS THAT HAVE BEEN CHANGED. |
Plan Reviews
Plan Number - S04-081
Plan Status: Final
Plan Description: SUBC
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/08/2005 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 03/17/2005 | COMPLETED |
| 03/08/2005 | ASSURANCES | 03/17/2005 | COMPLETED |
| 05/04/2005 | FINAL PLAT PACKAGE | 05/17/2005 | COMPLETED |
| 05/05/2005 | ASSURANCES | 05/11/2005 | COMPLETED |
| 07/07/2004 | FINAL PLAT REVIEW | 08/04/2004 | COMPLETED |
| 12/21/2004 | RESUBMITTAL - FINAL PLAT REVIEW | 01/07/2005 | COMPLETED |