Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: S04-081

Parcel: 141250050

Inspection Status: Approved

Inspection History: ASSURANCE - DOT TRAFFIC

Plan Number - S04-081

Inspection Description - ASSURANCE - DOT TRAFFIC

Inspection Status - Approved

Date Description Inspector Results Comments
08/15/2012 ASSURANCE - DOT TRAFFIC Approved SEE PREVIOUS LETTER DATED 6/6/2007 AS PER E-MAIL RECEIVED FROM MATTHEW GEWEKE ON 08/07/2012 8:00 AM

Dave,

okay here is the Traffic Eng. recorded PIA info for Sycamore Park Village Phase #2 & #6 plus all the other phases, just in case: I-2005-049 Sycamore Park Village Phase 6 accepted by Tom Stockett 18 May 2007
06/06/2007 ASSURANCE - DOT TRAFFIC Partial Approval I-2004-051 OFFSITE

APPROVAL
08/22/2006 ASSURANCE - DOT TRAFFIC Partial Approval APPROVAL FOR I-2005-049
08/22/2006 ASSURANCE - DOT TRAFFIC Partial Approval APPROVAL FOR I-2005-049
08/01/2006 ASSURANCE - DOT TRAFFIC Partial Approval APPROVAL FOR I-2004-053
08/01/2006 ASSURANCE - DOT TRAFFIC Denied DENIAL FOR I-2004-049

THE STREET NAME SIGNS FOR SYCAMORE PARK BOULEVARD (7800E) AND PANTANO ROAD (9300S) ARE MISSING FROM THE TOP OF THE STOP SIGN-POST IN THE SOUTHWEST CORNER OF THE INTERSECTION.
08/01/2006 ASSURANCE - DOT TRAFFIC Denied DENIAL FOR I-2004-051
1. FOR THE NORTHBOUND TRAFFIC, ON THE EASTSIDE OF KOLB RD STARTING AT VOYAGER ROAD, APPROXIMATELY THREE HUNDRED FIFTY (350) FEET OF WHITE SOLID SIX INCH LINE HOT SPRAYED THERMOPLATIC REFLOCTORIZED "EDGE LINE" STRIPING IS MISSING AND NEEDS TO BE INSTALLED.

2) FOR THE NORTHBOUND TRAFFIC ON KOLB ROAD APPROACHING VOYAGER ROAD, APPROXIMATELY FOUR HUNDRED (400) FEET OF WHITE SOLID EIGHT (8) INCH SPREAYED THERMOPLASTIC STRIPING IS TOO THIN, SPLATTERED AND UNACCEPTABLE.

3) FOR THE SOUTHBOUND TRAFFIC, IN THE LEFT TURN LANE OF KOLB ROAD, NORTH OF VOYAGER ROAD THE TWO HUNDRED (200) FEET OF WHITE SOLID EIGHT (8) INCH SPRAYED THERMOPLASTIC REFLECTORIZED LINE STRIPE NEEDS TO BE DONE. THE EXISTING STRIPING IS TOO THIN, SPLATTERED AND UNACCEPTABLE.
08/01/2006 ASSURANCE - DOT TRAFFIC Denied DENIAL FOR I-2004-050
TWO 25-MPH SPEED LIMIT SIGNS AND POSTS ARE ON THE GROUND AND NEED TO BE REINSTALLED:

1) THE EASTBOUND 25-MPH SIGN-POST ON SYCAMORE PARK BOULEVARD, APPROXIMATELY 100 FEET EAST OF RED OAK ROAD IS DOWN.

2) THE WESTBOUND 25-MPH SIGN-POST EAST OF 7517 E SYCAMORE PARK BOULEVARD, IS DOWN AND NEEDS TO BE REINSTALLED. (NOTE: REINSTALL THIS SIGN AND POST 35 FEET EAST OF ABOVE ADDRESS.)
08/01/2006 ASSURANCE - DOT TRAFFIC Partial Approval APPROVAL FOR I-2004-052