Plan: S04-032
Plan Details
Apply Date:
03/16/2004
Applicant:
RICK ENGINEERING
Description:
SUBC
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/20/2005 | ASSURANCE - UTILITY SERVICES | LHERNAND | Approved | |
12/01/2005 | ASSURANCE - DSD | DROBERTS | Approved | THE ROADWAYS, CURBS, AND UTILITIES HAVE BEEN CONSTRUCTED ON THIS SITE AT THIS TIME. THE DRAINAGEWAYS AND BASINS HAVE BEEN PREPARED IN A ROUGHEN STATE, BUT STILL NEED ADDITIONAL WORK PRIOR TO RELEASING PAST 75% OF THIS SITE. CURRENTLY THE ONLY STRUCTURE THAT IS BEING CONSTRUCTED AT THIS TIME IS LOCATED IN THE SOUTHWEST CORNER OF THIS PROJECT. A PUNCH LIST OF ITEMS WILL NOT BE COMPLETED AT THIS TIME DUE TO THE INCOMPLETENESS OF THE PROJECT. ADDITIONAL INSPECTIONS WILL BE REQUIRED FOR EACH RELEASE UNTIL ALL ASSURABLE ITEMS HAVE BEEN COMPLETED. |
08/02/2007 | ASSURANCE - DOT PERMITS & CODE | DLEE | Approved | I-2004-075 |
08/06/2007 | ASSURANCE - DOT TRAFFIC | TSTOCKETT | Approved | |
07/01/2010 | ASSURANCE - PC WASTEWATER | DROBERTS | Approved |
Plan Reviews
Plan Number - S04-032
Plan Status: Final
Plan Description: SUBC
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/04/2005 | FINAL PLAT REVIEW | 02/09/2005 | COMPLETED |
01/04/2005 | ASSURANCES | 03/09/2005 | COMPLETED |
03/05/2008 | REVISN TENT PLAT & CORE RESUB | 03/18/2008 | STOPPED |
03/09/2005 | ASSURANCES | 03/15/2005 | COMPLETED |
03/10/2005 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 04/04/2005 | COMPLETED |
03/17/2004 | TENTATIVE PLAT REVIEW | 04/20/2004 | COMPLETED |
05/17/2004 | RESUBMITTAL - TENTATIVE PLAT REVIEW | 06/08/2004 | COMPLETED |
06/10/2005 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 06/16/2005 | COMPLETED |
06/10/2005 | ASSURANCES | 07/07/2005 | COMPLETED |
06/10/2008 | REVISN TENT PLAT & CORE RESUB | 07/09/2008 | COMPLETED |
06/27/2005 | FINAL PLAT PACKAGE | 03/17/2008 | COMPLETED |
07/06/2004 | RESUBMITTAL - TENTATIVE PLAT REVIEW | 08/02/2004 | COMPLETED |
08/01/2008 | REVISN TENT PLAT & CORE RESUB | 09/08/2008 | COMPLETED |
10/30/2008 | REVISN TENT PLAT & CORE RESUB | 11/19/2008 | COMPLETED |