Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2005 | ASSURANCE - PC WASTEWATER | TACHONG | Approved | |
| 06/14/2005 | ASSURANCE - UTILITY SERVICES | TACHONG | Approved | TUCSON WATER APPROVAL |
| 08/31/2005 | ASSURANCE - DSD | DROBERTS | Approved | ALL STRUCTURES ON THIS SITE HAVE BEEN COMPLETED AT THIS TIME. THE FOLLOWING ISSUES REMAIN TO BE COMPLETED BEFORE THE SITE CAN BE FULLY RELEASED: 1) GENERAL SITE CLEAN-UP TO REMOVE ALL REMAINING UNUSED CONSTRUCTION MATERIALS, THIS WILL INCLUDE THE PILES OF D.G. LOCATED NORTH OF THE SOUTHERN MOST BASIN. 2) COMPLETE THE BASIN CONSTRUCTION PER THE APPROVED PLANS. 3) ENSURE THAT ALLL BASINS ON THIS PROJECT ARE FUNCTIONING AS DESCRIBED IN THE DRAINAGE REPORT. 4) PROVIDE AS-BUILT PLANS, AND A BASIN CERTIFICATION LETTER FOR THIS SITE FROM THE SIGNING ENGINEER. 5) CONSTRUCT OR REPAIR ALL DAMAGED SIDEWALKS, WHEELCHAIR ACCESS RAMPS, AND MISSING DRIVEWAYS AS NEEDED THROUGHOUT THE SITE. |
Plan Reviews
Plan Number - S03-027
Plan Status: Final
Plan Description: SUBC
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/27/2004 | FINAL PLAT REVIEW | 06/03/2004 | COMPLETED |
| 06/18/2004 | FINAL PLAT PACKAGE | 06/23/2004 | COMPLETED |
| 06/18/2004 | ASSURANCES | 06/23/2004 | COMPLETED |
| 09/26/2003 | TENTATIVE PLAT REVIEW | 10/28/2003 | COMPLETED |
| 11/14/2003 | RESUBMITTAL - TENTATIVE PLAT REVIEW | 12/01/2003 | COMPLETED |