Plan: S02-034
Plan Details
Apply Date:
07/30/2002
Applicant:
N/A
Description:
HIGH SIERRA ESTATES
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/29/2005 | COT - WATR - Design Plan Construction | Passed | {Activity date: 03/29/2005; Status: Approved; Inspector: LHERNAND; Comment: Entered by THAUSER1 - } | |
| 06/07/2005 | SPECIAL INSPECTION - OTHER (Third Party) | Passed | {Activity date: 06/07/2005; Status: Approved; Inspector: SRAVAL; Comment: Entered by THAUSER1 - G-2004-044} | |
| 09/12/2006 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 09/12/2006; Status: Approved; Inspector: TSTOCKET; Comment: Entered by THAUSER1 - I-2004-015} | |
| 08/18/2008 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 08/18/2008; Status: Approved; Inspector: JFEMLING; Comment: Entered by JFEMLIN1 - Bledder pipe installed in basin, eng. cert recieved with grading permit. Approved tp release assurance.} ; {Activity date: 12/20/2007; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE HAS BEEN CHECKED FOR THE FULL RELEASE OF THE ASSURANCES AND HAS BEEN FOUND TO BE INCOMPLETE AT THIS TIME FOR THE FOLLOWING REASONS. 1) THE DRAINAGE OF THE BASIN IS NOT WITHIN THE TIME FRAME ALLOWED BY THE PIMA COUNTY/CITY OF TUCSON DETENTION/RETENTION MANUAL, AND NEEDS TO BE BROUGHT INTO COMPLIANCE. 2) PROVIDE A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL DRAINAGE ITEMS LOCATED ON THIS PROJECT.} ; {Activity date: 10/17/2006; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - RECHECKED THE SITE, NO CHANGES HAVE BEEN MADE SINCE THE PREVIOUS INSPECTION ON 10/12/06. A COMPLETION BOND IS REQUIRED FOR ALL REMAINING ASSURABLE ITEMS NOT COMPLETE AT THIS TIME(SIDEWALKS, & DRIVEWAYS), GENERAL SITE CLEANUP, AND A CERTIFICATION LETTER FOR THE BASIN AND DRAINAGE ITEMS.} |