Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Pre-Construction
Type:
TW CIP Planning & Engineering
Address:
N/A
Address NEW:
N/A
Apply Date:
04/22/2026
Applicant:
N/A
Description:
PJW926 6699 S. Park (Morris A.N.G.B.) 6" Large Meter Assembly.

Outstanding Inspections

Permit Status: Pre-Construction
Permit Number: TW-CONS-0426-0066
Permite Description: PJW926 6699 S. Park (Morris A.N.G.B.) 6" Large Meter Assembly.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
TWPE Summary review of Daily Field Inspections N/A Scheduled
05/18/2026 TWPE Daily Field Inspection N/A In Field Accepted Herman located 6” Ac pipe at each end of station 22 and prepped for shut down tomorrow. They will cut pipe and begin 2-3 day shut down for meter assembly installation. Herman also bolted fittings, flanges and broke off megalugs.

Scheduled Inspections

Scheduled Inspections - TW-CONS-0426-0066
Status: Pre-Construction
Description: PJW926 6699 S. Park (Morris A.N.G.B.) 6" Large Meter Assembly.
Scheduled Date Description Entered By Entered Date
05/20/2026 TWPE Daily Field Inspection Scheduled
05/19/2026 TWPE Summary review of Daily Field Inspections Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .