Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
TW CIP Planning & Engineering
Address:
221 E OLIVE ST
Address NEW:
221 E OLIVE ST
Apply Date:
04/21/2026
Applicant:
Keith Faucett
Description:
Neighborhood main and meter replacement for Rodeo Addition Annex

Outstanding Inspections

Permit Status: Inspections
Permit Number: TW-CONS-0426-0061
Permite Description: Neighborhood main and meter replacement for Rodeo Addition Annex
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
TWPE Pump/Well - Pump testing, sampling, and well flush N/A Scheduled
09/23/2026 TWPE Service Connection - Service Line connections using Tapping sleeves / Hot taps, or meter installs N/A In Field Accepted
Used to track and report system pressure testing and associated water loss. N/A Scheduled
Used to track and report chlorination BacT testing and associated water loss. N/A Scheduled
10/07/2026 TWPE Summary review of Daily Field Inspections N/A Not Ready Not ready to take bacterial sample.
08/04/2026 TWPE Daily Field Inspection N/A In Field Accepted

Scheduled Inspections

Scheduled Inspections - TW-CONS-0426-0061
Status: Inspections
Description: Neighborhood main and meter replacement for Rodeo Addition Annex
Scheduled Date Description Entered By Entered Date
TWPE Daily Field Inspection Scheduled
08/17/2026 TWPE Service Connection - Service Line connections using Tapping sleeves / Hot taps, or meter installs Scheduled
11/06/2026 TWPE Daily Field Inspection Scheduled
10/06/2026 Used to track and report system pressure testing and associated water loss. Scheduled
08/19/2026 TWPE Service Connection - Service Line connections using Tapping sleeves / Hot taps, or meter installs Scheduled
07/30/2026 TWPE Pump/Well - Pump testing, sampling, and well flush Scheduled
TWPE Daily Field Inspection Scheduled
08/21/2026 TWPE Pump/Well - Pump testing, sampling, and well flush Scheduled
11/06/2026 TWPE Summary review of Daily Field Inspections Scheduled
TWPE Summary review of Daily Field Inspections Scheduled
08/11/2026 TWPE Service Connection - Service Line connections using Tapping sleeves / Hot taps, or meter installs Scheduled
TWPE Summary review of Daily Field Inspections Scheduled
10/07/2026 Used to track and report chlorination BacT testing and associated water loss. Scheduled
09/03/2026 TWPE Service Connection - Service Line connections using Tapping sleeves / Hot taps, or meter installs Scheduled
09/16/2026 TWPE Service Connection - Service Line connections using Tapping sleeves / Hot taps, or meter installs Scheduled
08/24/2026 TWPE Service Connection - Service Line connections using Tapping sleeves / Hot taps, or meter installs Scheduled
09/10/2026 TWPE Service Connection - Service Line connections using Tapping sleeves / Hot taps, or meter installs Scheduled
09/02/2026 TWPE Service Connection - Service Line connections using Tapping sleeves / Hot taps, or meter installs Scheduled
09/09/2026 TWPE Service Connection - Service Line connections using Tapping sleeves / Hot taps, or meter installs Scheduled
07/30/2026 TWPE Pump/Well - Pump testing, sampling, and well flush Scheduled
09/08/2026 TWPE Service Connection - Service Line connections using Tapping sleeves / Hot taps, or meter installs Scheduled
08/07/2026 TWPE Service Connection - Service Line connections using Tapping sleeves / Hot taps, or meter installs Scheduled
10/05/2026 Used to track and report system pressure testing and associated water loss. Scheduled
09/23/2026 TWPE Service Connection - Service Line connections using Tapping sleeves / Hot taps, or meter installs Scheduled
09/09/2026 TWPE Service Connection - Service Line connections using Tapping sleeves / Hot taps, or meter installs Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .