Permit: TS-PRM-0424-00183
Permit Details
Apply Date:
04/29/2024
Applicant:
William Hayes
Description:
Installation of new site signage for a newly built Carwash. Installing 1 monument, 7 wall signs, 3 lanes signs and 6 directionals. 2 LED menu displays. 2 sets of address numbers.
Permit Reviews
Permit Number - TS-PRM-0424-00183
Permit Status: Complete
Permit Description: Installation of new site signage for a newly built Carwash. Installing 1 monument, 7 wall signs, 3 lanes signs and 6 directionals. 2 LED menu displays. 2 sets of address numbers.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/30/2024 | PERMANENT SIGN REVIEW v.3 | 08/15/2024 | REQUIRES RESUBMIT |
| 06/20/2024 | PERMANENT SIGN REVIEW v.2 | 07/15/2024 | REQUIRES RESUBMIT |
| 08/16/2024 | PERMANENT SIGN REVIEW v.4 | 08/28/2024 | APPROVED |
| 04/29/2024 | PERMANENT SIGN REVIEW v.1 | 05/13/2024 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Complete
Permit Number: TS-PRM-0424-00183
Permit Description: Installation of new site signage for a newly built Carwash. Installing 1 monument, 7 wall signs, 3 lanes signs and 6 directionals. 2 LED menu displays. 2 sets of address numbers.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/23/2026 | COT - ENGR - Signage Final | Passed | UL Stickers and Manufacturer stickers are visible on all illuminated signs. All signs are per plan in the sign package in location and size. | |
| 02/23/2026 | COT - SIGN - Sign Electrical | Passed | UL stickers and manufacturer stickers are on all the illuminated signs. Disconnect switches are visible to all signs or the are located on the power supply boxes on the backside of the signs at parapet. Digital timer is next to electric panel with labeled circuits for signs. The monument sign also has a visible photo cell on the cabinet to adjust brightness between Day and night. |
|
| 02/23/2026 | COT - ENGR - Sign Footing and Excavation | Passed | 1/27/26 - Sign 'A' footing excavation is in accordance with approved plans. Okay to pour sign 'A' footing. | |
| 02/23/2026 | COT - ENGR - Sign Setback and Height | Passed | 1/27/26 - Sign 'A' footing location is in accordance with approved plans. |