Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Sign - Permanent
Address NEW:
5075 E VALENCIA RD
Apply Date:
04/29/2024
Applicant:
William Hayes
Description:
Installation of new site signage for a newly built Carwash. Installing 1 monument, 7 wall signs, 3 lanes signs and 6 directionals. 2 LED menu displays. 2 sets of address numbers.

Permit Reviews

Permit Number - TS-PRM-0424-00183
Permit Status: Complete
Permit Description: Installation of new site signage for a newly built Carwash. Installing 1 monument, 7 wall signs, 3 lanes signs and 6 directionals. 2 LED menu displays. 2 sets of address numbers.
Start Date Submittal Complete Date Status  
07/30/2024 PERMANENT SIGN REVIEW v.3 08/15/2024 REQUIRES RESUBMIT Review Details
06/20/2024 PERMANENT SIGN REVIEW v.2 07/15/2024 REQUIRES RESUBMIT Review Details
08/16/2024 PERMANENT SIGN REVIEW v.4 08/28/2024 APPROVED Review Details
04/29/2024 PERMANENT SIGN REVIEW v.1 05/13/2024 REQUIRES RESUBMIT Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TS-PRM-0424-00183
Permit Description: Installation of new site signage for a newly built Carwash. Installing 1 monument, 7 wall signs, 3 lanes signs and 6 directionals. 2 LED menu displays. 2 sets of address numbers.
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/23/2026 COT - ENGR - Signage Final Passed UL Stickers and Manufacturer stickers are visible on all illuminated signs. All signs are per plan in the sign package in location and size.
02/23/2026 COT - SIGN - Sign Electrical Passed UL stickers and manufacturer stickers are on all the illuminated signs. Disconnect switches are visible to all signs or the are located on the power supply boxes on the backside of the signs at parapet.
Digital timer is next to electric panel with labeled circuits for signs. The monument sign also has a visible photo cell on the cabinet to adjust brightness between Day and night.
02/23/2026 COT - ENGR - Sign Footing and Excavation Passed 1/27/26 - Sign 'A' footing excavation is in accordance with approved plans. Okay to pour sign 'A' footing.
02/23/2026 COT - ENGR - Sign Setback and Height Passed 1/27/26 - Sign 'A' footing location is in accordance with approved plans.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SSCW - SIGN PACKAGE R12_V2.PDF DOCUMENTS VIEW