Permit: TR-UTL-1225-02176
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
3786 E BRIGHT VIEW ST
Address NEW:
3786 E BRIGHT VIEW ST
Apply Date:
12/19/2025
Applicant:
ANGEL MORALES
Description:
wo#3177521 3786 e bright view st 15-14-09 se replacing hdpe service line at the front northwest corner of the lot in asphalt 6lf/ar
Permit Reviews
Permit Number - TR-UTL-1225-02176
Permit Status: Inspections
Permit Description: wo#3177521 3786 e bright view st 15-14-09 se replacing hdpe service line at the front northwest corner of the lot in asphalt 6lf/ar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/22/2025 | RIGHT-OF-WAY REVIEW v.1 | 12/22/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1225-02176
Permit Status: Inspections
Permit Description: wo#3177521 3786 e bright view st 15-14-09 se replacing hdpe service line at the front northwest corner of the lot in asphalt 6lf/ar
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 12/22/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 12/22/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-1225-02176
Permite Description: wo#3177521 3786 e bright view st 15-14-09 se replacing hdpe service line at the front northwest corner of the lot in asphalt 6lf/ar
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2026 | TRSP - ROW - Final | N/A | Re-inspection required | Work is complete and a temporary patches in place but final pavement repair as required for final inspection to pass |